2110 Malvern Hill Dr
Austin, TX 78745
2110 Malvern Hill Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2110 Malvern Hill Dr, Austin, TX 78745. The most recent, filed October 4, 2024, covers: “We are needing to reroute the line that is coming from the hot manifold in the master bedroom to behind where the vanity is at there is a pex line coming out of the slab which is not leaking the line thats leaking is the 1/2 copper going to master we need to run this over head and connect to the line going to the shower and tee off for a new shut off on the lav we will also have to rebuild the manifold on the hot side behind the water heater all these lines have been tested and are good to hook back up to we also need to reinstall the water heater and install a new tmp and expansion tank also run the pan line to below the flood rim also the master bathroom angle stop needs to be replaced it has a slow leak”.
Compiled from City of Austin records · updated Oct 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 4, 2024
- since Oct 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredWe are needing to reroute the line that is coming from the hot manifold in the master bedroom to behind where the vanity is at there is a pex line coming out of the slab which is not leaking the line thats leaking is the 1/2 copper going to master we need to run this over head and connect to the line going to the shower and tee off for a new shut off on the lav we will also have to rebuild the manifold on the hot side behind the water heater all these lines have been tested and are good to hook back up to we also need to reinstall the water heater and install a new tmp and expansion tank also run the pan line to below the flood rim also the master bathroom angle stop needs to be replaced it has a slow leak
- AppliedSep 30, 2024
- IssuedOct 4, 2024
- !WorkOct '24 – Apr '25
- Final inspection
Marked expired Apr 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectWe are needing to reroute the line that is coming from the hot manifold in the master bedroom to behind where the vanity is at there is a pex line coming out of the slab which is not leaking the line thats leaking is the 1/2 copper going to master we need to run this over head and connect to the line going to the shower and tee off for a new shut off on the lav we will also have to rebuild the manifold on the hot side behind the water heater all these lines have been tested and are good to hook back up to we also need to reinstall the water heater and install a new tmp and expansion tank also run the pan line to below the flood rim also the master bathroom angle stop needs to be replaced it has a slow leak
We are needing to reroute the line that is coming from the hot manifold in the master bedroom to behind where the vanity is at there is a pex line coming out of the slab which is not leaking the line thats leaking is the 1/2 copper going to master we need to run this over head and connect to the line going to the shower and tee off for a new shut off on the lav we will also have to rebuild the manifold on the hot side behind the water heater all these lines have been tested and are good to hook back up to we also need to reinstall the water heater and install a new tmp and expansion tank also run the pan line to below the flood rim also the master bathroom angle stop needs to be replaced it has a slow leak
City of Austin permitPlumbing PermitExpired- Record
- 2024-132126 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2110 Malvern Hill Dr
What is being built at 2110 Malvern Hill Dr?
The latest filing (City of Austin permit 2024-132126 PP, October 4, 2024) covers we are needing to reroute the line that is coming from the hot manifold in the master bedroom to behind where the vanity is at there is a pex line coming out of the slab which is not leaking the line thats leaking is the 1/2 copper going to master we need to run this over head and connect to the line going to the shower and tee off for a new shut off on the lav we will also have to rebuild the manifold on the hot side behind the water heater all these lines have been tested and are good to hook back up to we also need to reinstall the water heater and install a new tmp and expansion tank also run the pan line to below the flood rim also the master bathroom angle stop needs to be replaced it has a slow leak.
How many permits and filings does 2110 Malvern Hill Dr have?
1 filing across 1 project, from October 4, 2024 to October 4, 2024.
Is there other construction near 2110 Malvern Hill Dr?
Yes. Nearby filings include 7704 Malvern Hill Ct (replacement of complete existing central heat and air system with or without duct work, Oct 15, 2025); 2113 Malvern Hill Dr (replace condenser, May 15, 2025); 7905 Manassas Dr (replacement of an existing water heater, Mar 7, 2025).
How do I get alerts for new permits at 2110 Malvern Hill Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 7704 Malvern Hill CtOct 15, 2025Replacement of complete existing central heat and air system with or without duct work · 30 m away
- 2113 Malvern Hill DrMay 15, 2025Replace condenser · 75 m away
- 7905 Manassas DrMar 7, 2025Replacement of an existing water heater · 121 m away
- 7710 Beauregard CirAug 31, 2026Express- replace 4 windows with new windows of same size like for like install · 127 m away
- 7902 Manassas DrMar 30, 2026Replacement of complete existing central heat and air system with or without duct work garage mechanical closet · 130 m away
- 2203 Lear LnApr 22, 2024Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 7820 Manassas DrApr 11, 2025Emergency repair on meter · 142 m away
- 2210 Fancy Gap LnMay 1, 2025Replacement of complete existing central heat and air system with or without duct work · 146 m away
- 2212 Fancy Gap LnAug 17, 2026Express- tub to shower conversion like to like remodel · 157 m away
- 2202 Lear LnFeb 7, 2025Replacing service - does not have a main disconnect · 176 m away
- 2216 Fancy Gap LnMay 27, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton gas system · 181 m away
- 2106 Lear LnMar 3, 2025Express: roof replacement standing seam metal roof installation · 182 m away