2201 Harwick Dr
Austin, TX 78745
2201 Harwick Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2201 Harwick Dr, Austin, TX 78745. The most recent, filed January 28, 2026, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jan 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 28, 2026
- since Jan 28, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-010119 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2201 Harwick Dr
What is being built at 2201 Harwick Dr?
The latest filing (City of Austin permit 2026-010119 MP, January 28, 2026) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 2201 Harwick Dr have?
1 filing across 1 project, from January 28, 2026 to January 28, 2026.
Is there other construction near 2201 Harwick Dr?
Yes. Nearby filings include 2107 Lewood Cir (express: replacing windows replacing exterior doors replacing siding removing brick repairing roof decking boards bathroom remodel remove drywall/insulation only for purposes of structural evaluation drywall repair, Nov 21, 2023); 2300 Whitestone Dr (ev charger installation, Dec 1, 2025); 2203 Whitestone Dr (express: replace 5 windows like for like install new ceiling fan in living room repair shower drain stop, Jun 17, 2024).
How do I get alerts for new permits at 2201 Harwick Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2107 Lewood CirNov 21, 2023Express: replacing windows replacing exterior doors replacing siding removing brick repairing roof decking boards bathroom remodel remove drywall/insulation only for purposes of structural evaluation drywall repair · 85 m away
- 2300 Whitestone DrDec 1, 2025Ev charger installation · 92 m away
- 2203 Whitestone DrJun 17, 2024Express: replace 5 windows like for like install new ceiling fan in living room repair shower drain stop · 93 m away
- 2302 Whitestone DrJul 9, 2026Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms kitchen and washer drain lines. 2 access holes will be made one in the front side by doorway entrance and the second by the garage to tunnel and reroute kitchen and second bathroom total length of tunnel is approximately 60 feet of tunnel. sewer line will be replaced from the home to the city tap connection total length of sewer line is approximately 70 feet · 108 m away
- 2107 Whitestone DrMay 9, 2024Express: tub to shower conversion · 111 m away
- 5801 Lewood DrNov 30, 2023Replace drain lines with pvc sch-40 via approximately 70ft tunnel 2 baths 1 kitchen sink 1 washer box at main structure. replace approximately 30ft of sewer line for main structure · 112 m away
- 2111 Lewood CirOct 14, 2025Emergency repair - replace meter can with new 200r meter base and install new main breaker enclosure and replace defective interior panel · 111 m away
- 2301 Whitestone DrJan 5, 2026Replacing building sewer line. tunneling up to 70 feet · 116 m away
- 5705 Lewood DrJun 28, 2024Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 2105 Whitestone DrOct 5, 2026Main line replacement in yard (30-40 feet). main sewer line replacement (30-40 feet). all drains and pipes replaced under house via tunnel · 126 m away
- 2303 Whitestone DrJun 4, 2025Replace main panel · 131 m away
- 2108 Lewood CirNov 9, 2026Open living area and kitchen up install structural beam add 2 full bathrooms and 4 additional rooms. no new square footage. two windows being changed to meet egress requirements one being added for the same reason. a civil engineer is working on a tap plan since they are increasing bathrooms to 4 · 136 m away