2305 Southern Oaks Dr
Austin, TX 78745
2305 Southern Oaks Dr: 4 projects on record
City of Austin lists 4 filings across 4 projects at 2305 Southern Oaks Dr, Austin, TX 78745. The most recent, filed February 8, 2024, covers: “Construct new driveway approach of 17 ft and curb & gutter of 25 ft. no sidewalk inspection per plan review”.
Compiled from City of Austin records · updated Feb 8, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Feb 8, 2024
- since Feb 8, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new driveway approach of 17 ft and curb & gutter of 25 ft. no sidewalk inspection per plan review
- AppliedMar 14, 2022
- IssuedFeb 8, 2024
- WorkFeb '24 – Feb '24
- Final inspectionFeb 20, 2024
Passed final inspection Feb 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
4 projectsConstruct new driveway approach of 17 ft and curb & gutter of 25 ft. no sidewalk inspection per plan review
Construct new driveway approach of 17 ft and curb & gutter of 25 ft. no sidewalk inspection per plan review
City of Austin permitDriveway / SidewalksFinal- Record
- 2022-070812 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New pool with autofiller
New pool with autofiller
City of Austin permitPlumbing PermitFinal- Record
- 2023-082382 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New pool with autofiller
New pool with autofiller
City of Austin permitElectrical PermitFinal- Record
- 2023-082382 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New pool with autofiller
New pool with autofiller
City of Austin permitBuilding PermitFinal- Record
- 2023-082382 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2305 Southern Oaks Dr
What is being built at 2305 Southern Oaks Dr?
The latest filing (City of Austin permit 2022-070812 DS, February 8, 2024) covers construct new driveway approach of 17 ft and curb & gutter of 25 ft. no sidewalk inspection per plan review.
How many permits and filings does 2305 Southern Oaks Dr have?
4 filings across 4 projects, from February 8, 2024 to February 8, 2024.
Is there other construction near 2305 Southern Oaks Dr?
Yes. Nearby filings include 2307 Southern Oaks Dr (new construction in-ground pool, Jan 12, 2025); 2304 Southern Oaks Dr (install new 6.320 kw rooftop solar system and 13.500 kw energy storage system for existing residential only, Jun 27, 2025); 2309 Southern Oaks Dr (repair to sewer line via tunnel and repair yardline, Mar 14, 2024).
How do I get alerts for new permits at 2305 Southern Oaks Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2307 Southern Oaks DrJan 12, 2025New construction in-ground pool · 26 m away
- 2304 Southern Oaks DrJun 27, 2025Install new 6.320 kw rooftop solar system and 13.500 kw energy storage system for existing residential only · 45 m away
- 2309 Southern Oaks DrMar 14, 2024Repair to sewer line via tunnel and repair yardline · 46 m away
- 2214 Village Way DrApr 6, 2024Install an irrigation system to permit address · 46 m away
- 2301 Southern Oaks DrNov 15, 2024Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 2212 Village Way DrNov 17, 2025Replace existing main fpe panel as well as the meter can with austin energy meter can as well as installing a riser to meet code · 48 m away
- 2311 Southern Oaks DrNov 26, 2024Temp power ref. 2024-062006 bp · 70 m away
- 2208 Village Way DrAug 26, 202680 tunnel below the foundation to replace entire drain system (excludes kitchen). 3 access holes - left right front. yard sewer line spot repair · 79 m away
- 2310 Southern Oaks DrApr 10, 2025Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 2313 Southern Oaks DrNov 10, 2025Tunnel up to 63 under the foundation to repair break on the drain line · 89 m away
- 2307 Fair Oaks DrAug 26, 2025Replace 2 existing windows same for same · 99 m away
- 2300 Village CirAug 19, 2024Excavate roughly 80 feet under the foundation of the home to expose the cast iron sewer lines. cut out all exposed lines and replace using schedule 40 pvc. hang all new piper per code using clevis hangers · 101 m away