groundranger
Historic · latest filing Nov 2023Residential

2604 Blue Cv

Austin, TX 78745

2604 Blue Cv: 1 project on record

City of Austin lists 1 filing across 1 project at 2604 Blue Cv, Austin, TX 78745. The most recent, filed November 21, 2023, covers: “Express: window replacement (like for like)”.

Compiled from City of Austin records · updated Nov 21, 2023

Projects
1
1 filings
Latest filing
Nov 21, 2023
since Nov 21, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Express: window replacement (like for like)

  1. AppliedNov 21, 2023
  2. IssuedNov 21, 2023
  3. WorkNov '23 – Dec '23
  4. Final inspectionDec 1, 2023

Passed final inspection Dec 1, 2023.

2 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Express: window replacement (like for like)

    Express: window replacement (like for like)

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2604 Blue Cv

What is being built at 2604 Blue Cv?

The latest filing (City of Austin permit 2023-150411 BP, November 21, 2023) covers express: window replacement (like for like).

How many permits and filings does 2604 Blue Cv have?

1 filing across 1 project, from November 21, 2023 to November 21, 2023.

Is there other construction near 2604 Blue Cv?

Yes. Nearby filings include 2606 Blue Cv (plumber is adding a new septic grinder pump for the kitchen sink and needs power for the pump and alarm. main panel is in back yard about 60 away from the new pump. we are going to trench down and over to the pump with 3/4 pvc using 5 conductors #12awg to create 2 new dedicated circuits. one for the pump and the other for the alarm. terminated in a 2 gang bell box with 2 wr gfci outlets and in use cover. torque conductors on bus bars and breakers. label new circuits on main panel, Apr 6, 2026); 2509 Lazy Oaks Dr (remove old water heater and install 50 gallon gas water heater, Apr 1, 2024); 2601 Blue Cv (replacement of complete existing central heat and air system with or without duct work, Sep 18, 2024).

How do I get alerts for new permits at 2604 Blue Cv?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Email me when a new permit is filed