2807 Gettysburg Dr
Austin, TX 78745
Backup battery system permitted at 2807 Gettysburg Dr
An electrical permit covers installation of a backup battery system and an additional meter socket at 2807 Gettysburg Dr in Austin. The City of Austin issued the permit on October 19, 2026, and lists it as final.
Summarized from City of Austin records · updated Oct 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 19, 2026
- since Oct 19, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledBase: installing a backup battery system and additional meter socket
- AppliedSep 17, 2026
- IssuedOct 19, 2026
- WorkOct '26 – Oct '26
- Final inspectionOct 30, 2026
Passed final inspection Oct 30, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitFinal- Record
- 2026-122838 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2807 Gettysburg Dr
What is being installed at 2807 Gettysburg Dr?
A City of Austin electrical permit covers a backup battery system and an additional meter socket at the address.
When was the permit for 2807 Gettysburg Dr filed?
The permit was filed on October 19, 2026.
What is the permit number for work at 2807 Gettysburg Dr?
The City of Austin permit number is 2026-122838 EP.
Is the electrical permit at 2807 Gettysburg Dr final?
Yes. The City of Austin lists permit 2026-122838 EP as final.
Is a new home being built at 2807 Gettysburg Dr?
The available record is for an electrical permit to install a backup battery system and additional meter socket; it does not describe new home construction.
Also being built nearby
All of 78745- 8200 Avocet DrMar 19, 2025Replacement of an existing water heater replace existing gas water · 40 m away
- 2812 Gettysburg DrNov 2, 2026Replacement of an existing water heater 50 gallon natural gas water heater replacement · 50 m away
- 2801 Gettysburg DrOct 16, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system · 56 m away
- 8015 Willet TrlOct 17, 2024The work scope will include tunneling under the home a total 8ft. this is to replace up to 8ft of existing sewer line below slab · 103 m away
- 2819 Gettysburg DrAug 28, 2026Base: installing a backup battery system and additional meter socket · 116 m away
- 8009 Willet TrlOct 7, 2025Construct new driveway approach of 18 ft · 124 m away
- 2821 Gettysburg DrDec 15, 2023New 4 ft gas line for new generator · 131 m away
- 8007 Willet TrlJun 24, 2026Express: foundation repair - installing steel piers · 145 m away
- 8117 Willet TrlSep 30, 2026Replacement of complete existing central heat and air system with or without duct work · 152 m away
- 8100 Fort Sumter RdJul 16, 2025Replacement of complete existing central heat and air system with or without duct work · 152 m away
- 8102 Willet TrlSep 10, 2026Sewer line replacement by tunneling under home the break is on the y fitting underneath the front porch 5 · 153 m away
- 8100 Willet TrlMar 7, 2024Replacement of complete existing central heat and air system with or without duct work · 158 m away