2909 W William Cannon Dr
Austin, TX 78745
Austin permits show HVAC and sign replacements at a church
Austin permits indicate HVAC system replacements and electrical sign work at 2909 W William Cannon Dr. The latest filing, dated October 25, 2024, covers a like-for-like replacement of a 7.5-ton gas system with no ductwork.
Summarized from City of Austin records · updated Oct 25, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Oct 25, 2024
- since Jun 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace 7.5 ton gas system like for like no ductwork
- AppliedAug 22, 2019
- IssuedOct 25, 2024
- WorkOct '24 – Jan '25
- Final inspectionJan 24, 2025
Passed final inspection Jan 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
4 projectsReplace 7.5 ton gas system like for like no ductwork
Replace 7.5 ton gas system like for like no ductwork
City of Austin permitMechanical PermitFinal- Record
- 2019-172817 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Impact family church -remove two (2) existing led cabinets and replace with two (2) new led cabinets
Impact family church -remove two (2) existing led cabinets and replace with two (2) new led cabinets
City of Austin permitElectrical PermitFinal- Record
- 2024-054763 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-076375 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-118323 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2909 W William Cannon Dr
What is being built at 2909 W William Cannon Dr?
The permits describe replacement and maintenance work, not a new building: HVAC systems were replaced, and two LED sign cabinets were replaced at Impact Family Church.
Is a new church being built at 2909 W William Cannon Dr in Austin?
The available permits do not describe a new church building. They cover HVAC replacements and replacement LED sign cabinets.
What work was permitted at 2909 W William Cannon Dr?
Permits cover HVAC system replacements and the replacement of two LED sign cabinets. The electrical permit, 2024-054763 EP, was filed July 3, 2024.
When was the latest permit filed for 2909 W William Cannon Dr?
The latest listed permit was filed October 25, 2024. Permit 2019-172817 MP covers a like-for-like replacement of a 7.5-ton gas system with no ductwork.
Were the permits for 2909 W William Cannon Dr approved?
The four listed City of Austin permits have Final status. They were filed between September 13, 2023, and October 25, 2024.
What does permit 2024-054763 EP cover at 2909 W William Cannon Dr?
The July 3, 2024 electrical permit covers removing two existing LED cabinets and replacing them with two new LED cabinets at Impact Family Church.
Also being built nearby
All of 78745- 2909 William Cannon DrMar 24, 2020Jubilee christian center & new multifamily project
- 2909-1/2 William Cannon DrDec 15, 2009T-mobile jubilee christian center · 50 m away
- 2809 W William Cannon DrJun 5, 2025Interior repair/restoration to burn unit 103 104 203 204 205 with smoke & water damage -building back like for like · 164 m away
- 2800 Alderwood DrOct 11, 2024Replacement of complete existing central heat and air system with or without duct work · 192 m away
- 7102 Eganhill DrNov 18, 2026Changing out old fpe panel and adding ae bypass meter. like for like service swap 200 amps. adding surge and proper grounding · 231 m away
- 2800 W William Cannon DrSep 18, 2024C3 canopy elevation illuminated texaco star s3. signage to be replaced like for like · 242 m away
- 3101 William Cannon DrMar 27, 2026The offices at william cannon (sp-2023-0271c with r) · 248 m away
- 6810 Deatonhill DrSep 23, 2026Replace old rotten deck with new deck matching the existing deck footprint and layout · 262 m away
- 6903 Deatonhill DrNov 25, 2025Chimney siding replacement for building. 5 · 265 m away
- 2716 William Cannon DrMar 2, 2007William cannon cell site · 273 m away
- 2721 Bryonhall DrMar 15, 2025Enno - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 main breaker. upgrading revenue meter to 200 amps · 291 m away
- 3014 William Cannon DrMar 2, 2007Jefferson at william cannon · 293 m away