301 W Stassney Ln

Austin, TX 78745

Permits cover repairs and system replacements at 301 W Stassney

City of Austin permits at 301 W Stassney Ln document repairs and system replacements at an existing residence, not a new building. Filings from June 29, 2023, through September 26, 2025, include a garage-header replacement, an electric-vehicle charging circuit, and central heating and air system replacements.

Summarized from City of Austin records · updated Sep 26, 2025

Projects
5
5 filings
Latest filing
Sep 26, 2025
since Sep 24, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedSep 25, 2025
  2. IssuedSep 26, 2025
  3. WorkSep '25 – Oct '25
  4. Final inspectionJul 13, 2026

Passed final inspection Jul 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

5 projects
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. (issa sherif) - installation of circuit for elec. vehicle charging station - esip

    (issa sherif) - installation of circuit for elec. vehicle charging station - esip

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Interior remodel: project consist of removing and replacing structural header above garage door. engineering included and attached

    Interior remodel: project consist of removing and replacing structural header above garage door. engineering included and attached

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 301 W Stassney Ln

What is being built at 301 W Stassney Ln?

The available permits do not identify a new building. They cover work at an existing residence, including a garage-header replacement and central heating and air system replacements.

When was the latest permit filed at 301 W Stassney Ln?

The latest listed filing is City of Austin mechanical permit 2025-122030 MP, dated September 26, 2025. It covers replacement of the complete existing central heating and air system.

Are there permits for repairs at 301 W Stassney Ln?

Yes. Building permit 2023-082291 BP, filed June 29, 2023, covers replacement of the structural header above the garage door. Mechanical permits also record central heating and air system replacements.

Was an electric vehicle charger permitted at 301 W Stassney Ln?

An electrical permit dated July 17, 2023, records installation of a circuit for an electric-vehicle charging station. The permit number is 2023-084828 EP.

What's being built near 212 Stassney Retail / Office Below, Apartments Above?

A nearby filing for 212 W Stassney Ln describes an 8,257-square-foot, two-story building with retail or office space on the first floor and four apartments on the second. That filing is dated January 26, 2026.