308 Sheraton Ave
Austin, TX 78745
308 Sheraton Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 308 Sheraton Ave, Austin, TX 78745. The most recent, filed July 3, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jul 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 3, 2024
- since Jul 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 27, 2024
- IssuedJul 3, 2024
- WorkJul '24 – Dec '24
- Final inspectionNov 25, 2024
Passed final inspection Nov 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-080879 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 308 Sheraton Ave
What is being built at 308 Sheraton Ave?
The latest filing (City of Austin permit 2024-080879 MP, July 3, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 308 Sheraton Ave have?
1 filing across 1 project, from July 3, 2024 to July 3, 2024.
What is being built near Os St Elmo in Austin?
308 Sheraton Ave is about 208 m from Os St Elmo (405 E St Elmo Rd). Its latest filing is for replacement of complete existing central heat and air system with or without duct work.
Is there other construction near 308 Sheraton Ave?
Yes. Nearby filings include 402 Sheraton Ave (tunnel up to 10 to expose and replace cast iron sewer line under home. tunnel access will be located in front of home, Apr 6, 2026); 4604 Greenridge Ter (expedited review: new construction of a 2-story single family res [4bed 3bath] with attached garage, Apr 29, 2024); 304 Rowland Dr (replacement of complete existing central heat and air system with or without duct work, Apr 24, 2026).
How do I get alerts for new permits at 308 Sheraton Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 402 Sheraton AveApr 6, 2026Tunnel up to 10 to expose and replace cast iron sewer line under home. tunnel access will be located in front of home · 75 m away
- 4604 Greenridge TerApr 29, 2024Expedited review: new construction of a 2-story single family res [4bed 3bath] with attached garage · 86 m away
- 304 Rowland DrApr 24, 2026Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 4511 Lucksinger LnJul 8, 2026Replacement of complete existing central heat and air system with or without duct work villa denese mh park space 36 · 115 m away
- 309 Rowland DrNov 9, 2026Addition/remodel- garage conversion interior remodel with addition and full roof replacement · 137 m away
- 210 Rowland DrJan 27, 2026Install mini split system · 154 m away
- 305 Rowland DrDec 18, 2025Interior remodel - see attached document · 155 m away
- 4613 Greenridge TerAug 20, 2025Tunnel under home to replace drain system with schedule 40 pvc up to bottom of foundation and out to city tap location · 160 m away
- 301 Rowland DrApr 8, 2025Replacement of complete existing central heat and air system with or without duct work change out like for like with duct work 1 gas unit · 162 m away
- 208 Rowland DrNov 5, 2024Convert 200a overhead service to a secondary riser · 168 m away
- 4701 Greenridge TerFeb 6, 2026Tunnel underneath slab to replace 40 ft of drain lines. (replacing kitchen hall bath and washing machine) one access hole on the left outside of house. replacing 55ft of sewer yard line · 172 m away
- 400 Chippendale AveNov 18, 2026Service upgrade to 200 amps · 181 m away