3224 Oak Aly
Austin, TX 78745
3224 Oak Aly: 2 projects on record
City of Austin lists 2 filings across 2 projects at 3224 Oak Aly, Austin, TX 78745 since September 20, 2024. The most recent, filed October 3, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Oct 3, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Oct 3, 2024
- since Sep 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedSep 26, 2024
- IssuedOct 3, 2024
- WorkOct '24 – Mar '25
- Final inspectionMar 21, 2025
Passed final inspection Mar 21, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-130927 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tunnel under the foundation to access and repair the break on the main line. one access hole. tunnel about 4 under the foundation to replace from reducer to clean out. trench about 8 in the yard to replace the main sewer line in yard
Tunnel under the foundation to access and repair the break on the main line. one access hole. tunnel about 4 under the foundation to replace from reducer to clean out. trench about 8 in the yard to replace the main sewer line in yard
City of Austin permitPlumbing PermitExpired- Record
- 2024-126131 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3224 Oak Aly
What is being built at 3224 Oak Aly?
The latest filing (City of Austin permit 2024-130927 PP, October 3, 2024) covers replacement of an existing water heater.
How many permits and filings does 3224 Oak Aly have?
2 filings across 2 projects, from September 20, 2024 to October 3, 2024.
Is there other construction near 3224 Oak Aly?
Yes. Nearby filings include 3226 Oak Aly (***timed virtual inspection: 07/27/2026 @ 9 am*** replacement of complete existing central heat and air system with or without duct work, Jun 19, 2026); 3225 Oak Aly (total demolition of 2544 sq ft sfr circa 1979, Apr 13, 2026); 3230 Oak Aly (repair 20ft of sewer line under home -slab home, Mar 4, 2025).
How do I get alerts for new permits at 3224 Oak Aly?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 3226 Oak AlyJun 19, 2026***timed virtual inspection: 07/27/2026 @ 9 am*** replacement of complete existing central heat and air system with or without duct work · 20 m away
- 3225 Oak AlyApr 13, 2026Total demolition of 2544 sq ft sfr circa 1979 · 48 m away
- 3230 Oak AlyMar 4, 2025Repair 20ft of sewer line under home -slab home · 61 m away
- 3118 Sacbe CvJul 22, 2012Casas grandes; replat · 82 m away
- 3115 Sacbe CvFeb 13, 2011Casas grandes subdivision; amended plat of lot 15 · 113 m away
- 3202 Oak AlyMay 24, 2024Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 3205 China GroveApr 22, 2024Express: foundation repair as per scope of work attached · 123 m away
- 3111 Sacbe CvFeb 12, 2026Replacement of complete existing central heat and air system with or without duct work replace current system with new 3 ton variable speed ecoer system. new eod heat pump condenser and eah air handler on r454b refrigerant · 126 m away
- 8106 Nottaway CvMay 16, 2024Express: replace 8 windows and 4 doors like for like · 134 m away
- 3207 China GroveJun 19, 2024Replacement of complete existing central heat and air system with or without duct work · 136 m away
- 3303 Oak AlyJul 15, 2024Perform concrete breakout in bathroom to excavate roughly 2-3 feet and perform sewer repair on bathroom sewer line. hang new pipe per code using clevis hangers · 141 m away
- 3209 China GroveAug 11, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas · 145 m away