3309 Tommie Lee Wyatt Ln
Austin, TX 78745
Central heating and air system replacement in Austin
A complete existing central heat and air system is being replaced at 3309 Tommie Lee Wyatt Ln. The City of Austin issued mechanical permit 2026-124595 MP on September 30, 2026, for a two-ton vertical, two-stage gas system with ductwork insulation noted in the description.
Summarized from City of Austin records · updated Sep 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 30, 2026
- since Sep 30, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work 2t vertical two stage gas ductwork insulation comp
- AppliedSep 22, 2026
- IssuedSep 30, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 29, 2026
Passed final inspection Oct 29, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work 2t vertical two stage gas ductwork insulation comp
Replacement of complete existing central heat and air system with or without duct work 2t vertical two stage gas ductwork insulation comp
City of Austin permitMechanical PermitFinal- Record
- 2026-124595 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3309 Tommie Lee Wyatt Ln
What work is permitted at 3309 Tommie Lee Wyatt Ln?
A City of Austin mechanical permit covers replacement of the complete existing central heat and air system. The permit description notes a two-ton vertical, two-stage gas system.
When was the heating and air replacement permitted?
The City of Austin issued permit 2026-124595 MP on September 30, 2026.
Is a new home being built at 3309 Tommie Lee Wyatt Ln?
The available permit record is for replacing an existing central heating and air system, not for new home construction.
Does the permit include ductwork?
The description says the replacement is with or without ductwork and notes ductwork insulation. It does not specify further details.
What type of HVAC system is listed in the permit?
The permit description lists a two-ton vertical, two-stage gas system as part of the replacement of the existing central heat and air system.