groundranger
Active · latest filing Oct 2026Residential

3317 Galesburg Dr

Austin, TX 78745

Backup battery system permitted at 3317 Galesburg Dr

A City of Austin electrical permit indicates a backup battery system and an additional meter socket are being installed at 3317 Galesburg Dr. The permit, 2026-135989 EP, was filed on October 30, 2026, and is listed as active.

Summarized from City of Austin records · updated Oct 30, 2026

Projects
1
1 filings
Latest filing
Oct 30, 2026
since Oct 30, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedOct 15, 2026
  2. IssuedOct 30, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
12% through of the permit windowOct 30, 2026 → Apr 28, 2027

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3317 Galesburg Dr

What is being installed at 3317 Galesburg Dr?

A City of Austin electrical permit describes installation of a backup battery system and an additional meter socket. It does not provide the battery system's size.

When was the permit for 3317 Galesburg Dr filed?

The permit was filed on October 30, 2026.

What is the permit number for work at 3317 Galesburg Dr?

The permit number is 2026-135989 EP. It is listed as an active City of Austin electrical permit.

Is a new house being built at 3317 Galesburg Dr?

The available record is for electrical work to install a backup battery system and an additional meter socket; it does not indicate a new house.

Does the permit show the cost of the battery installation?

No project value is listed in the available permit record.

Also being built nearby

All of 78745
Email me when it passes final inspection