3326 Zion Rest Ln
Austin, TX 78745
Zion Rest Baptist Church HVAC system replacement permitted
A permit filed June 16, 2026, covers replacement of the existing central heating and air system serving the middle sanctuary unit at 3326 Zion Rest Ln. The City of Austin lists the mechanical permit, 2026-075466 MP, as final. An earlier site plan for Zion Rest Baptist Church was approved and released in 2007.
Summarized from City of Austin records · updated Jun 16, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jun 16, 2026
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work middle sanctuary unit
- AppliedJun 12, 2026
- IssuedJun 16, 2026
- WorkJun '26 – Sep '26
- Final inspectionSep 28, 2026
Passed final inspection Sep 28, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work middle sanctuary unit
Replacement of complete existing central heat and air system with or without duct work middle sanctuary unit
City of Austin permitMechanical PermitFinal- Record
- 2026-075466 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-135117 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3326 Zion Rest Ln
What is happening at 3326 Zion Rest Ln in Austin?
A City of Austin permit covers replacement of the existing central heating and air system serving the middle sanctuary unit. The permit was filed June 16, 2026.
Is a new building being built at 3326 Zion Rest Ln?
The records provided show a 2026 permit for replacing an existing heating and air system, not a new building. They also list a church site plan approved and released in 2007.
What does permit 2026-075466 MP cover?
It covers replacement of the complete existing central heat and air system, with or without duct work, for the middle sanctuary unit. The City of Austin lists its status as final.
When was work permitted at Zion Rest Baptist Church?
The mechanical permit for the heating and air system replacement was filed June 16, 2026. A site plan case for Zion Rest Baptist Church was approved and released on March 2, 2007.
Is the HVAC permit at 3326 Zion Rest Ln final?
Yes. The City of Austin lists permit 2026-075466 MP, filed June 16, 2026, as final.
Also being built nearby
All of 78745- 3338 Zion Rest LnMar 9, 2017Mariposa montessori school · 58 m away
- 3341 Zion Rest LnSep 27, 2024Zion rest missionary baptist church · 133 m away
- 7500 Calumet CvApr 12, 2024Repair main breaker panel ae shut off power customer without power · 182 m away
- 7501 Calumet CvJun 11, 2026Replacement of an existing water heater 40 gallon propane gas tank water heater change out 17003 flintrock road austin tx 78738 · 204 m away
- 3322 Clarksburg DrNov 4, 2025Yard sewer spot repair and 10 tunnel below the foundation to repair master bath drain line.1 access - left · 211 m away
- 3336 Clarksburg DrFeb 23, 2026Replacement of complete existing central heat and air system with or without duct work · 240 m away
- 3318 Clarksburg DrNov 21, 2025Replace existing 100a service with new 200a meter base and electrical panel · 243 m away
- 3316 Clarksburg DrFeb 26, 2025Replacement of complete existing central heat and air system with or without duct work · 262 m away
- 3333 Clarksburg DrMar 7, 2025Replacement of an existing water heater tankless · 272 m away
- 3402 Clarksburg DrApr 21, 2025Express: foundation repair · 290 m away
- 3214 Barnsley DrFeb 3, 2026Replacement of an existing water heater · 291 m away
- 3300 Harpers Ferry LnFeb 24, 2025Meter and panel replacement: 200a service upgrade (underground) · 305 m away