Recent · latest filing Jan 2026Commercial

4128 S 1st St

Austin, TX 78745

Austin Fire Station 17 gets plumbing and HVAC work

City of Austin permits document plumbing renovations and replacement of the existing heating and air-conditioning system at Austin Fire Station 17. The mechanical permit was finalized November 21, 2025, and the plumbing permit was finalized January 22, 2026. Earlier permits cover installation of a DEF tank and cabinet.

Summarized from City of Austin records · updated Jan 22, 2026

Projects
7
7 filings
Latest filing
Jan 22, 2026
since Nov 28, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Plumbing renovations to austin fire station #17

  1. AppliedJan 13, 2026
  2. IssuedJan 22, 2026
  3. WorkJan '26 – Feb '26
  4. Final inspectionFeb 13, 2026

Passed final inspection Feb 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

7 projects
  1. Plumbing renovations to austin fire station #17

    Plumbing renovations to austin fire station #17

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work replacing three split systems with like-for-like at fs 17

    Replacement of complete existing central heat and air system with or without duct work replacing three split systems with like-for-like at fs 17

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Installation of def tank and cabinet

    Installation of def tank and cabinet

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Installation of def tank and cabinet

    Installation of def tank and cabinet

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Replace existing optional standby generator automatic transfer switch and add a docking station on existing concrete equipment pad

    Replace existing optional standby generator automatic transfer switch and add a docking station on existing concrete equipment pad

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Replace existing optional standby generator automatic transfer switch and add a docking station on existing concrete equipment pad

    Replace existing optional standby generator automatic transfer switch and add a docking station on existing concrete equipment pad

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Replace existing optional standby generator automatic transfer switch and add a docking station on existing concrete equipment pad

    Replace existing optional standby generator automatic transfer switch and add a docking station on existing concrete equipment pad

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4128 S 1st St

What work is happening at 4128 S 1st St in Austin?

City permits document plumbing renovations and replacement of the existing central heating and air-conditioning system at Austin Fire Station 17. Other permits cover installation of a DEF tank and cabinet.

Is a new building being built at 4128 S 1st St?

The permits listed for this address describe work at Austin Fire Station 17, including plumbing renovations, HVAC replacement and a DEF tank and cabinet installation. They do not describe a new building.

When was the HVAC permit for Austin Fire Station 17 issued?

The City of Austin mechanical permit, 2025-148076 MP, is dated November 21, 2025, and has final status. It covers replacement of the existing central heat and air system.

What does permit 2026-004161 PP cover?

The City of Austin plumbing permit is dated January 22, 2026, and has final status. Its description says it covers plumbing renovations to Austin Fire Station 17.

What are the DEF tank permits for at 4128 S 1st St?

The permit descriptions say they cover installation of a DEF tank and cabinet. The building permit is dated December 24, 2024, and the electrical permit is dated March 20, 2025.