groundranger
Historic · latest filing Aug 2024Residential

4423 Hank Ave

Austin, TX 78745

4423 Hank Ave: 2 projects on record

City of Austin lists 2 filings across 2 projects at 4423 Hank Ave, Austin, TX 78745 since May 24, 2024. The most recent, filed August 19, 2024, covers: “Installation of dedicated circuit for car charger”.

Compiled from City of Austin records · updated Aug 19, 2024

Projects
2
2 filings
Latest filing
Aug 19, 2024
since May 24, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Installation of dedicated circuit for car charger

  1. AppliedAug 14, 2024
  2. IssuedAug 19, 2024
  3. WorkAug '24 – Aug '24
  4. Final inspectionAug 26, 2024

Passed final inspection Aug 26, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Installation of dedicated circuit for car charger

    Installation of dedicated circuit for car charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4423 Hank Ave

What is being built at 4423 Hank Ave?

The latest filing (City of Austin permit 2024-102652 EP, August 19, 2024) covers installation of dedicated circuit for car charger.

How many permits and filings does 4423 Hank Ave have?

2 filings across 2 projects, from May 24, 2024 to August 19, 2024.

Is there other construction near 4423 Hank Ave?

Yes. Nearby filings include 4419 Hank Ave (install irrigation system ref:2025 012594 bp, Jul 21, 2025); 4422 Hank Ave (building 2: middle residence new 2 story detached residence with 2 bedroom 2.5 bathroom. part of 3-unit use, Oct 26, 2026); 4424 Hank Ave (this residential unit was built in 2024 with an included electric vehicle charger circuit but no charger was installed during the build. the occupant has now obtained an electric vehicle and wants to install their hardwired charger onto the existing circuit. this permit is for the installation of a hardwired ev charger onto this existing branch circuit, Oct 21, 2025).

How do I get alerts for new permits at 4423 Hank Ave?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Email me when a new permit is filed