4515 Roundup Trl
Austin, TX 78745
Electrical and sewer-line work at 4515 Roundup Trail
Austin permit records indicate sewer and plumbing work at the residence, followed by an electrical service upgrade. The plumbing permit was filed February 17, 2024, and the electrical permit was filed December 2, 2025; both are marked final.
Summarized from City of Austin records · updated Dec 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 2, 2025
- since Feb 17, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrading old federal pacific panel to a 200a main breaker service
- AppliedNov 24, 2025
- IssuedDec 2, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 17, 2025
Passed final inspection Dec 17, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsUpgrading old federal pacific panel to a 200a main breaker service
Upgrading old federal pacific panel to a 200a main breaker service
City of Austin permitElectrical PermitFinal- Record
- 2025-151065 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace sewer line from clean-out outside to city tap line sewer line from city tap to approximate 60ft under foundation line existing kitchen sink line all the way to main trunk line tunnel under both bathrooms from back of home replace plumbing under both bathrooms all the way to kitchen tie in test complete system for leaks
Replace sewer line from clean-out outside to city tap line sewer line from city tap to approximate 60ft under foundation line existing kitchen sink line all the way to main trunk line tunnel under both bathrooms from back of home replace plumbing under both bathrooms all the way to kitchen tie in test complete system for leaks
City of Austin permitPlumbing PermitFinal- Record
- 2024-018764 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4515 Roundup Trl
What is happening at 4515 Roundup Trail in Austin?
Austin records show a sewer and plumbing permit and a later electrical service upgrade permit at the residence. Both permits are marked final.
Was a new building permitted at 4515 Roundup Trail?
The records provided list plumbing and electrical work, not a permit for a new building.
What plumbing work was permitted at 4515 Roundup Trail?
Permit 2024-018764 PP, filed February 17, 2024, describes replacing sewer lines and plumbing beneath the foundation. It is marked final.
Was the electrical service upgraded at 4515 Roundup Trail?
Yes. Permit 2025-151065 EP, filed December 2, 2025, describes upgrading an old Federal Pacific panel to a 200-amp main breaker service. It is marked final.
Are the permits for 4515 Roundup Trail complete?
Both listed Austin permits—the February 17, 2024 plumbing permit and the December 2, 2025 electrical permit—have a final status.
Also being built nearby
All of 78745- 4513 Roundup TrlNov 12, 2026Service upgrade · 18 m away
- 4517 Roundup TrlJul 28, 2026Replace water line in yard · 26 m away
- 4512 Frontier TrlDec 11, 202410 tunnel below the foundation to repair bathroom drain line. 1 access on left · 57 m away
- 4508 Frontier TrlOct 28, 2026Base: installing a backup battery system and additional meter socket · 89 m away
- 4527 Pack Saddle PassOct 1, 2025New pool for single family residence.(with plumbing permit) · 92 m away
- 4506 Roundup TrlJun 20, 2024Replace 40 section of sewer yard line · 95 m away
- 4509 Navajo PathJan 27, 2026Express - removing and replacing 12 windows & 1 door like for like · 97 m away
- 4507 Navajo PathJan 6, 2025New in-ground gunite pool (200 sq ft) new wood and concrete decking · 101 m away
- 4516 Pack Saddle PassAug 13, 2025Replacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater · 110 m away
- 4509 Rim Rock PathAug 15, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton two stage vertical gas · 110 m away
- 4504 Roundup TrlFeb 10, 2025Replace sewer line · 118 m away
- 4503 Navajo PathSep 5, 2024New finishes & fixtures at hall bath remodel to convert hall closet to 1/2 bath enlarge closet new built-ins cosmetic improvements at exterior. new trim new front door in existing opening install new beams per structural drawing/specifications. 8/23/24 sm - only rooms not impacted by the remodel is the primary bath and kitchen. full 1 1/2 bath remodel along with a new office sitting room for primary suite · 123 m away
More restaurants in 78745.