4701 Richmond Ave
Austin, TX 78745
4701 Richmond Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 4701 Richmond Ave, Austin, TX 78745. The most recent, filed December 5, 2023, covers: “Tank to tankless water heater conversion install”.
Compiled from City of Austin records · updated Dec 5, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 5, 2023
- since Dec 5, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTank to tankless water heater conversion install
- AppliedDec 1, 2023
- IssuedDec 5, 2023
- WorkDec '23 – Dec '23
- Final inspectionDec 20, 2023
Passed final inspection Dec 20, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectTank to tankless water heater conversion install
Tank to tankless water heater conversion install
City of Austin permitPlumbing PermitFinal- Record
- 2023-154152 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4701 Richmond Ave
What is being built at 4701 Richmond Ave?
The latest filing (City of Austin permit 2023-154152 PP, December 5, 2023) covers tank to tankless water heater conversion install.
How many permits and filings does 4701 Richmond Ave have?
1 filing across 1 project, from December 5, 2023 to December 5, 2023.
Is there other construction near 4701 Richmond Ave?
Yes. Nearby filings include 4617 Richmond Ave (total de4mo of sfr 1232 sq ft circa 1964, Mar 11, 2026); 4704 Richmond Ave (construct new driveway approach of 18.7 ft ***no sidewalk inspection per bp, Apr 30, 2025); 4616 Banister Ln (provide and install 26kw ng powered generator and 150a automatic transfer switch/panel combo with associated conduit wiring and 0 load modules. upgrade wiring in existing mast and meter to 150a, Aug 27, 2024).
How do I get alerts for new permits at 4701 Richmond Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 4617 Richmond AveMar 11, 2026Total de4mo of sfr 1232 sq ft circa 1964 · 45 m away
- 4704 Richmond AveApr 30, 2025Construct new driveway approach of 18.7 ft ***no sidewalk inspection per bp · 49 m away
- 4616 Banister LnAug 27, 2024Provide and install 26kw ng powered generator and 150a automatic transfer switch/panel combo with associated conduit wiring and 0 load modules. upgrade wiring in existing mast and meter to 150a · 53 m away
- 4618 Banister LnApr 23, 2024Cap off water and waste water · 54 m away
- 4706 Richmond AveAug 14, 2025Construct new driveway approach of 20 ft. no sidewalk inspection per plan review · 61 m away
- 4700 Banister LnJun 9, 2026Irrigation system installation · 66 m away
- 4619 Banister LnNov 10, 2026New construction- new 2 story single family residence with 4 bed 5 bath with rear patio · 96 m away
- 4610 Banister LnAug 25, 2026Base: installing a backup battery system and additional meter socket · 98 m away
- 4621 Banister LnMay 10, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 99 m away
- 1305 Green Forest DrJan 2, 2025Construct new driveway approach of 17 ft and curb & gutter of 10 ft · 101 m away
- 4617 Banister LnFeb 5, 2025Install irrigation to residence · 108 m away
- 4705 Gillis StJul 15, 2024Upgrade overhead service including relocating branch circuits from interior panel into new outdoor main disconnect load center. existing interior panel will be empty and abandoned after completion · 110 m away