4908 Manchester Cir
Austin, TX 78745
Drain-line repair permitted at 4908 Manchester Cir
A City of Austin plumbing permit filed January 8, 2026, indicates work to tunnel beneath the foundation and replace part of the main drain line at 4908 Manchester Cir. The permit also describes one access hole in front.
Summarized from City of Austin records · updated Jan 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 8, 2026
- since Jan 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled15 tunnel below the foundation to replace partial main drain line.1 access hole in front
- AppliedDec 23, 2025
- IssuedJan 8, 2026
- WorkJan '26 – Feb '26
- Final inspectionFeb 6, 2026
Passed final inspection Feb 6, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project15 tunnel below the foundation to replace partial main drain line.1 access hole in front
15 tunnel below the foundation to replace partial main drain line.1 access hole in front
City of Austin permitPlumbing PermitFinal- Record
- 2025-161605 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4908 Manchester Cir
What is being built at 4908 Manchester Cir?
A City of Austin plumbing permit indicates a tunnel beneath the foundation to replace part of the main drain line, with one access hole in front.
What work is the permit for at 4908 Manchester Cir?
Permit 2025-161605 PP covers plumbing work described as tunneling below the foundation to replace a partial main drain line.
When was the plumbing permit filed for 4908 Manchester Cir?
The City of Austin permit was filed January 8, 2026.
Is a new building planned at 4908 Manchester Cir?
The available permit describes drain-line replacement work beneath the foundation, not construction of a new building.
Does the permit include an access hole at 4908 Manchester Cir?
Yes. The permit description specifies one access hole in front.
Also being built nearby
All of 78745- 4906 Manchester CirSep 29, 2026This project consists of an interior residential remodel of the existing single-family residence. no additions no increase in conditioned square footage and no changes to the existing building footprint are proposed. see attached for details · 21 m away
- 4910 Manchester CirOct 31, 2025Express - foundation repair · 21 m away
- 4912 Manchester CirApr 17, 2025Express replace 11 existing windows · 37 m away
- 4903 Manchester CirSep 24, 2026Tunnel under slab foundation and repair broken drain lines with new pvc. emergency repair tenants cannot flush their toilets · 55 m away
- 4914 Manchester CirJan 9, 2024Running a gas line to dryer and changing out water heater · 57 m away
- 4920 Manchester CirMar 23, 2026Excavate 40 trench to repair mian drain line in yard · 115 m away
- 4924 Manchester CirJan 25, 2024*partial demolition* complete interior remodel/garage conversion **electrical work performed in garage area only · 145 m away
- 4811 Congress AveMay 22, 20264811 s. congress concept sp · 173 m away
- 203 Winchester CtOct 3, 20255 trench tor repair yard sewer and 3 tunnel below the foundation to repair break just upstream of clean out on sewer main. access hole on left · 182 m away
- 205 Winchester CtFeb 26, 2026We will be tunneling 10 ft under the slab to make repairs to the drain line as well as excavating 40ft in the yard to replace the sewer line · 186 m away
- 4911 Congress AveMar 2, 2007Dr. j. fred kramer, jr · 199 m away
- 4742 Suburban DrDec 18, 2025A resubdivision of lot 3-a, a resubdivision of lot 1, block v, greenwood hills section five · 203 m away