500 Seminole Dr
Austin, TX 78745
500 Seminole Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 500 Seminole Dr, Austin, TX 78745. The most recent, filed September 22, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Sep 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 22, 2025
- since Sep 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 4, 2025
- IssuedSep 22, 2025
- WorkSep '25 – Jan '26
- Final inspectionJan 16, 2026
Passed final inspection Jan 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-112754 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 500 Seminole Dr
What is being built at 500 Seminole Dr?
The latest filing (City of Austin permit 2025-112754 MP, September 22, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 500 Seminole Dr have?
1 filing across 1 project, from September 22, 2025 to September 22, 2025.
Is there other construction near 500 Seminole Dr?
Yes. Nearby filings include 402 Seminole Dr (re pipe all sewer drain lines under slab to clean out, Mar 14, 2024); 509 Wolverton Dr (install level 2 ev charger, Mar 6, 2025); 508 Seminole Dr (replacing main panel like for like grounding and surge protection, Nov 7, 2025).
How do I get alerts for new permits at 500 Seminole Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 402 Seminole DrMar 14, 2024Re pipe all sewer drain lines under slab to clean out · 73 m away
- 509 Wolverton DrMar 6, 2025Install level 2 ev charger · 81 m away
- 508 Seminole DrNov 7, 2025Replacing main panel like for like grounding and surge protection · 84 m away
- 405 Seminole DrSep 19, 2024Repair to sewerline under house via tunnel · 92 m away
- 511 Seminole DrJul 21, 2025Plumbing sewer repair · 93 m away
- 506 Tilbury LnApr 15, 2024Replace cast iron pipe under slab for kitchen and 1 bathroom · 105 m away
- 403 Seminole DrMar 6, 2025Installation of new irrigation · 108 m away
- 508 Wolverton DrJul 31, 2025Replacement of complete existing central heat and air system with or without duct work · 121 m away
- 4801 Surrey DrOct 3, 2024Replacement of an existing water heater · 137 m away
- 4903 Old Castle RdApr 13, 2026Replacement of complete existing central heat and air system with or without duct work · 142 m away
- 312 Tilbury LnJun 9, 2026Replacement of complete existing central heat and air system with or without duct work hvac changeout: remove and replace existing 2.5-ton vertical split system · 151 m away
- 4709 Greenridge TerApr 22, 2025Replacing the main 4 sewer main from house approx 50 · 155 m away