5000 S IH 35 Svrd Sb
Austin, TX 78745
EV charging upgrades permitted at 5000 S IH 35
Austin permits filed April 25, 2025, cover converting six parking stalls into two Level 2 and four Level 3 EV stalls, adding four Level 2 charging outlets in a service garage, and replacing two Level 2 EV chargers. A September 24, 2025, electrical permit covers one set of individually mounted illuminated letters on the front wall. The listed permits are marked final.
Summarized from City of Austin records · updated Sep 24, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Sep 24, 2025
- since Nov 16, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledFord group 1 of south austin - install one (1) set of individually mounted lit letters on front wall
- AppliedSep 23, 2025
- IssuedSep 24, 2025
- WorkSep '25 – Jun '26
- Final inspectionJun 23, 2026
Passed final inspection Jun 23, 2026.
Permit & project history
5 projectsFord group 1 of south austin - install one (1) set of individually mounted lit letters on front wall
Ford group 1 of south austin - install one (1) set of individually mounted lit letters on front wall
City of Austin permitElectrical PermitFinal- Record
- 2025-119735 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
(6) standard parking stalls are to be converted into (2) standard level-2 electric vehicle (ev) parking stalls and (4) level-3 ev parking stalls. (4) level-2 ev charging outlets will be installed in the service garage. (2) level-2 evcs will be replaced with new
(6) standard parking stalls are to be converted into (2) standard level-2 electric vehicle (ev) parking stalls and (4) level-3 ev parking stalls. (4) level-2 ev charging outlets will be installed in the service garage. (2) level-2 evcs will be replaced with new
City of Austin permitBuilding PermitFinal- Record
- 2025-049085 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
(6) standard parking stalls are to be converted into (2) standard level-2 electric vehicle (ev) parking stalls and (4) level-3 ev parking stalls. (4) level-2 ev charging outlets will be installed in the service garage. (2) level-2 evcs will be replaced with new. building ev
(6) standard parking stalls are to be converted into (2) standard level-2 electric vehicle (ev) parking stalls and (4) level-3 ev parking stalls. (4) level-2 ev charging outlets will be installed in the service garage. (2) level-2 evcs will be replaced with new. building ev
City of Austin permitElectrical PermitFinal- Record
- 2025-049085 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
We will be installing 3 200kw cp power link dcfc stations 3 dual cp6000 19.2kw lvl 2 stations 1 cph50 1 cpf50 and 10 nema 14-50 outlets. 2 existing lvl 2 stations will be retrofitted for the sd and nvd area stations
We will be installing 3 200kw cp power link dcfc stations 3 dual cp6000 19.2kw lvl 2 stations 1 cph50 1 cpf50 and 10 nema 14-50 outlets. 2 existing lvl 2 stations will be retrofitted for the sd and nvd area stations
City of Austin permitElectrical PermitExpired- Record
- 2023-148125 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
We will be installing 3 200kw cp power link dcfc stations 3 dual cp6000 19.2kw lvl 2 stations 1 cph50 1 cpf50 and 10 nema 14-50 outlets. 2 existing lvl 2 stations will be retrofitted for the sd and nvd area stations
We will be installing 3 200kw cp power link dcfc stations 3 dual cp6000 19.2kw lvl 2 stations 1 cph50 1 cpf50 and 10 nema 14-50 outlets. 2 existing lvl 2 stations will be retrofitted for the sd and nvd area stations
City of Austin permitBuilding PermitExpired- Record
- 2023-148125 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5000 S IH 35 Svrd Sb
What is being built at 5000 S IH 35 Svrd Sb in Austin?
Permits indicate EV parking and charging upgrades, along with illuminated letters on the front wall. The records do not specify a broader construction project.
Are EV chargers being added at 5000 S IH 35?
Yes. A permit filed April 25, 2025, covers two Level 2 and four Level 3 EV parking stalls, four Level 2 charging outlets in the service garage, and replacement of two Level 2 chargers.
How many EV parking stalls are planned at 5000 S IH 35?
The April 25, 2025, permit describes converting six standard stalls into two Level 2 and four Level 3 EV stalls.
What do the permits say about signage at 5000 S IH 35?
An electrical permit filed September 24, 2025, covers one set of individually mounted illuminated letters on the front wall. The permit description calls this “Ford group 1 of south austin.”
When were permits filed for work at 5000 S IH 35?
The EV charging permits were filed April 25, 2025. The electrical permit for illuminated letters was filed September 24, 2025.
What are the permit numbers for work at 5000 S IH 35?
The EV charging permits are 2025-049085 BP and 2025-049085 EP. The permit for illuminated letters is 2025-119735 EP.
Also being built nearby
All of 78745- 5000 IH 35 SvrdMar 2, 2007Mcmorris ford service facility expansion · 55 m away
- 4914 IH 35 SvrdJan 21, 2022Nissan · 74 m away
- 4916 N IH 35 Svrd SbMay 13, 2026Rebuild · 100 m away
- 4914 S IH 35 Svrd SbAug 2, 2024City limits nissan wall sign · 102 m away
- 4910 IH 35 SvrdMar 2, 2007Cen-tex nissan · 107 m away
- 4904 N IH 35 Svrd SbJun 8, 2026Rebuilding a vandalized service · 113 m away
- 4900 N IH 35 Svrd SbAug 27, 2024The subject lot is changing as a result of a portion of the lot being purchased by txdot due to ih-35 row expansion. a portion of the building is being demolished to accommodate the new property lines · 117 m away
- 5015 IH 35 SvrdMay 28, 2009Wal-mart subdivision, amended plat of lots 2 and 3 · 123 m away
- 5001 IH 35 SvrdMar 7, 2016Comfort suites hotel south · 135 m away
- 5107 IH 35 SvrdDec 17, 2013Kipp school · 175 m away
- 1620 Teri RdNov 12, 2026New construction of a new hotel · 197 m away
- 4911 IH 35 SvrdJan 21, 2022Liberty storage (with/resub of sp-2015-0483c) · 202 m away