Electrical service rebuild permitted at 5010 Richmond Ave
An electrical service rebuild at 5010 Richmond Ave was permitted on November 6, 2025. The City of Austin permit describes a new mast and two service boxes to bring the service up to current code; its status is Final.
Summarized from City of Austin records · updated Nov 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2025
- since Nov 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledMeter removed due to sparks coming out of connection austin energy will not reconnect the service until we update the service to current code. it will need a mast and two new service boxes. *austin energy overhead tap box service (meter grouped together) (service rebuild only)
- AppliedOct 30, 2025
- IssuedNov 6, 2025
- WorkNov '25 – Nov '25
- Final inspectionNov 25, 2025
Passed final inspection Nov 25, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectMeter removed due to sparks coming out of connection austin energy will not reconnect the service until we update the service to current code. it will need a mast and two new service boxes. *austin energy overhead tap box service (meter grouped together) (service rebuild only)
Meter removed due to sparks coming out of connection austin energy will not reconnect the service until we update the service to current code. it will need a mast and two new service boxes. *austin energy overhead tap box service (meter grouped together) (service rebuild only)
City of Austin permitElectrical PermitFinal- Record
- 2025-140281 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5010 Richmond Ave
What is happening at 5010 Richmond Ave in Austin?
A City of Austin electrical permit describes a service rebuild with a new mast and two service boxes. The permit, 2025-140281 EP, was filed on November 6, 2025.
Is a new home being built at 5010 Richmond Ave?
The record is for an electrical service rebuild, not a new-home construction permit. It was filed on November 6, 2025.
Why is the electrical service being rebuilt at 5010 Richmond Ave?
The permit says the meter was removed after sparks came from its connection, and Austin Energy would not reconnect service until it was updated to current code.
What work does permit 2025-140281 EP cover?
It covers a service rebuild that includes a mast and two new service boxes. The City of Austin filed the electrical permit on November 6, 2025.
Has the electrical permit for 5010 Richmond Ave been finalized?
The City of Austin lists permit 2025-140281 EP as Final. The record date is November 6, 2025.
Also being built nearby
All of 78745- 5052 Lansing DrOct 24, 2025Replacement of complete existing central heat and air system with or without duct work · 55 m away
- 5004 Lark CvAug 13, 20265004 lark cove (unit b) pipe by water heater needs city inspection per gas company and swapping out 50 gal water heater · 82 m away
- 5046 Lansing DrJun 19, 2024Standalone permit to replace a damage meter box on a single residence · 84 m away
- 1407 Randy CirJun 17, 2024New pool for single family residence. (with plumbing permit) · 91 m away
- 5259 Meadow Creek DrJun 23, 2026Express: tub to shower conversion · 101 m away
- 5257 Meadow Creek DrJun 24, 2024Express: tub-to-shower conversion solid dryer duct installation siding replacement · 111 m away
- 4911 Brighton RdFeb 17, 2026Upgrade electrical service to 200 amp overhead · 116 m away
- 5254 Meadow Creek DrNov 28, 2023Install irrigation system · 153 m away
- 5205 Emerald Meadow DrSep 18, 2024Replacement of an existing water heater · 160 m away
- 4904 Hawk CvFeb 18, 2025Re-building existing service power loop - changing out (2) meters - only replacing 1 breaker box - bringing everything else up to code on entrance service loop only · 165 m away
- 5009 Majestic DrMar 6, 2026Replacement of an existing water heater new 40-gallon gas water heater change out 5009 majestic drive austin tx 78745 · 166 m away
- 5038 Lansing DrMar 28, 2025Tunnel under slab to replace drains ** entry points 15 ft of the main building in front of the house to replace sewer lines · 167 m away