507 Eberhart Ln
Austin, TX 78745
507 Eberhart Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 507 Eberhart Ln, Austin, TX 78745. The most recent, filed October 1, 2024, covers: “Install sub panel due to crossed circuits”.
Compiled from City of Austin records · updated Oct 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 1, 2024
- since Oct 1, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstall sub panel due to crossed circuits
Install sub panel due to crossed circuits
City of Austin permitElectrical PermitExpired- Record
- 2024-130632 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 507 Eberhart Ln
What is being built at 507 Eberhart Ln?
The latest filing (City of Austin permit 2024-130632 EP, October 1, 2024) covers install sub panel due to crossed circuits.
How many permits and filings does 507 Eberhart Ln have?
1 filing across 1 project, from October 1, 2024 to October 1, 2024.
What is being built near Poco Loco Group in Austin?
507 Eberhart Ln is about 160 m from Poco Loco Group (724 Eberhart Ln). Its latest filing is for install sub panel due to crossed circuits.
Is there other construction near 507 Eberhart Ln?
Yes. Nearby filings include 6401 S 1st St (install 1 lighted channel letter wall sign (red apply side), Apr 4, 2024); 512 Eberhart Ln (replacement of complete existing central heat and air system with or without duct work, Sep 29, 2026); 6407 South Meadows Blvd (hoff - 40-15691 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. upgrading revenue meter and subpanel to 200 amps. underground service requesting wire pull, Sep 22, 2026).
How do I get alerts for new permits at 507 Eberhart Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 6401 S 1st StApr 4, 2024Install 1 lighted channel letter wall sign (red apply side) · 85 m away
- 512 Eberhart LnSep 29, 2026Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 6407 South Meadows BlvdSep 22, 2026Hoff - 40-15691 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. upgrading revenue meter and subpanel to 200 amps. underground service requesting wire pull · 135 m away
- 6311 S 1st StFeb 9, 2026Eplan: expedited review - new construction of dumpster enclosure for multi-family mixed use complex (189 sq ft) · 144 m away
- 6409 South Meadows BlvdJun 6, 2024Replacement of complete existing central heat and air system with or without duct work · 155 m away
- 724 Eberhart Ln · Poco Loco GroupNov 12, 2024Poco loco - south austin — renovation/alteration — remodel of portion of an existing business center · 160 m away
- 6509 S 1st StOct 29, 2026We will install 35 steel piers in the office. existing storage facility · 162 m away
- 6420 S 1st StFeb 21, 2025Replacing 4 zinsco panels inside and 4 zinsco main panels outside and upgrading to 150amp per unit as required by insurance company for policy renewal unit 101-104 · 167 m away
- 6404 Bradsher DrFeb 5, 2009South meadows sec 2, amended plat of lots 22 & 23 — south meadows section 2, amended plat of lots 22 & 23 · 186 m away
- 6418 South Meadows BlvdSep 2, 2026Express: tub to shower conversion; replace existing water heater · 188 m away
- 6413 Bradsher DrJun 16, 2026Eplan: residential expedited review - new construction of a three-unit res. building 2 2-story [3bed 2.5bath] with attached garage · 219 m away
- 6407 Bradsher DrJan 29, 2026Irrigation backyard of house 3 · 220 m away