509 Teaberry Cir
Austin, TX 78745
Bathroom remodel permitted at 509 Teaberry Cir
City of Austin permits filed from April 22 to May 22, 2025, cover an interior bathroom remodel in a two-story single-family home at 509 Teaberry Cir. The work includes partial demolition, moving a shower wall one foot, and updating electrical, lighting, ventilation, and shower fixtures.
Summarized from City of Austin records · updated May 22, 2025
- Projects
- 4
- 4 filings
- Latest filing
- May 22, 2025
- since Apr 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled*partial demolition* interior remodel of two-story sfr bathroom - demolish part of the shower wall and move shower wall 1ft. frame new shower wall install 2 new gfci outlets relocation of installation of 1 canned light. 1 new light fixture above mirror. 1 new efficient exhaust fan update switches relocation of shower fixtures
- AppliedApr 11, 2025
- IssuedMay 22, 2025
- WorkMay '25 – Jul '25
- Final inspectionJul 18, 2025
Passed final inspection Jul 18, 2025.
1 contact on this project · 1 phone number
Permit & project history
4 projects*partial demolition* interior remodel of two-story sfr bathroom - demolish part of the shower wall and move shower wall 1ft. frame new shower wall install 2 new gfci outlets relocation of installation of 1 canned light. 1 new light fixture above mirror. 1 new efficient exhaust fan update switches relocation of shower fixtures
*partial demolition* interior remodel of two-story sfr bathroom - demolish part of the shower wall and move shower wall 1ft. frame new shower wall install 2 new gfci outlets relocation of installation of 1 canned light. 1 new light fixture above mirror. 1 new efficient exhaust fan update switches relocation of shower fixtures
City of Austin permitMechanical PermitFinal- Record
- 2025-047582 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*partial demolition* interior remodel of two-story sfr bathroom - demolish part of the shower wall and move shower wall 1ft. frame new shower wall install 2 new gfci outlets relocation of installation of 1 canned light. 1 new light fixture above mirror. 1 new efficient exhaust fan update switches relocation of shower fixtures
*partial demolition* interior remodel of two-story sfr bathroom - demolish part of the shower wall and move shower wall 1ft. frame new shower wall install 2 new gfci outlets relocation of installation of 1 canned light. 1 new light fixture above mirror. 1 new efficient exhaust fan update switches relocation of shower fixtures
City of Austin permitElectrical PermitFinal- Record
- 2025-047582 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*partial demolition* interior remodel of two-story sfr bathroom - demolish part of the shower wall and move shower wall 1ft. frame new shower wall install 2 new gfci outlets relocation of installation of 1 canned light. 1 new light fixture above mirror. 1 new efficient exhaust fan update switches relocation of shower fixtures
*partial demolition* interior remodel of two-story sfr bathroom - demolish part of the shower wall and move shower wall 1ft. frame new shower wall install 2 new gfci outlets relocation of installation of 1 canned light. 1 new light fixture above mirror. 1 new efficient exhaust fan update switches relocation of shower fixtures
City of Austin permitPlumbing PermitFinal- Record
- 2025-047582 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*partial demolition* interior remodel of two-story sfr bathroom - demolish part of the shower wall and move shower wall 1ft. frame new shower wall install 2 new gfci outlets relocation of installation of 1 canned light. 1 new light fixture above mirror. 1 new efficient exhaust fan update switches relocation of shower fixtures
*partial demolition* interior remodel of two-story sfr bathroom - demolish part of the shower wall and move shower wall 1ft. frame new shower wall install 2 new gfci outlets relocation of installation of 1 canned light. 1 new light fixture above mirror. 1 new efficient exhaust fan update switches relocation of shower fixtures
City of Austin permitBuilding PermitFinal- Record
- 2025-047582 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 509 Teaberry Cir
What is being remodeled at 509 Teaberry Cir in Austin?
Permits cover an interior bathroom remodel in a two-story single-family home. The work includes moving a shower wall one foot and updating fixtures, lighting, outlets, and ventilation.
When were permits filed for the bathroom remodel at 509 Teaberry Cir?
The building permit was filed April 22, 2025. Plumbing, electrical, and mechanical permits followed between May 14 and May 22, 2025.
What does the 509 Teaberry Cir permit include?
The permit descriptions include partial demolition of a shower wall, framing a new wall, two new GFCI outlets, lighting updates, a new exhaust fan, and relocated shower fixtures.
Is a new home being built at 509 Teaberry Cir?
The City of Austin records describe an interior bathroom remodel of an existing two-story single-family home, not new home construction.
What are the permit numbers for work at 509 Teaberry Cir?
The records share permit number 2025-047582, with suffixes BP, PP, EP, and MP for building, plumbing, electrical, and mechanical permits. They were filed from April 22 through May 22, 2025.
Also being built nearby
All of 78745- 511 Teaberry CirApr 22, 2026Express: foundation repair · 18 m away
- 510 Teaberry CirApr 5, 2024Replacement of an existing water heater · 54 m away
- 502 Strawberry CvOct 26, 2026Replacement of complete existing central heat and air system with or without duct work 3ton gas system replacement · 58 m away
- 500 Teaberry CirApr 19, 2024Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 403 Mulberry DrSep 12, 2025Express: non-structural interior and exterior remodel of residence and garage for fire damage remediation · 123 m away
- 7112 Bill Hughes RdSep 15, 2026Express- replace 3 windows like for like in existing residential area · 135 m away
- 7200 Bill Hughes RdJan 21, 2026Express: convert bathtub to walk in shower only drywall at shower surround will be removed plumbing will not be relocated · 142 m away
- 600 Mulberry DrJul 6, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 2.5 ton york condenser evaporator coil and gas furnace · 158 m away
- 7214 Teaberry DrDec 8, 2023Upgrade existing 125amp underground service to a 200amp · 176 m away
- 604 Mulberry DrAug 5, 2026Replacement of complete existing central heat and air system with or without duct work · 184 m away
- 7009 Bill Hughes RdAug 19, 2025Hvac replacement to existing residence only · 190 m away
- 503 Thelma DrJan 30, 2024Construct new driveway approach of 12 ft and sidewalk of 40 lf · 195 m away
More demolitions in 78745.