5111 Kings Hwy
Austin, TX 78745
5111 Kings Hwy: 1 project on record
City of Austin lists 1 filing across 1 project at 5111 Kings Hwy, Austin, TX 78745. The most recent, filed September 28, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Sep 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 28, 2025
- since Sep 28, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 23, 2025
- IssuedSep 28, 2025
- WorkSep '25 – Feb '26
- Final inspectionFeb 11, 2026
Passed final inspection Feb 11, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-121380 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5111 Kings Hwy
What is being built at 5111 Kings Hwy?
The latest filing (City of Austin permit 2025-121380 MP, September 28, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 5111 Kings Hwy have?
1 filing across 1 project, from September 28, 2025 to September 28, 2025.
Is there other construction near 5111 Kings Hwy?
Yes. Nearby filings include 5106 Kings Hwy (replace 60 ft of cast iron piping with schedule 40 pvc for drain line under the home. *main sewer line, Nov 17, 2025); 5106 Orleans Ct (repipe the kitchen sink and washer drain to the sanitary sewer yard line just outside the right rear corner of the house. we will remove about 50 square feet of drywall to accomplish this. we will also chip thru the top of the exterior concrete beam without cutting the steel reinforcement. we will hire an engineer to inspect the structure as per code, Jul 28, 2026); 5105 Orleans Ct (installing overhead mast and 200 amp meter socket, Oct 28, 2025).
How do I get alerts for new permits at 5111 Kings Hwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5106 Kings HwyNov 17, 2025Replace 60 ft of cast iron piping with schedule 40 pvc for drain line under the home. *main sewer line · 62 m away
- 5106 Orleans CtJul 28, 2026Repipe the kitchen sink and washer drain to the sanitary sewer yard line just outside the right rear corner of the house. we will remove about 50 square feet of drywall to accomplish this. we will also chip thru the top of the exterior concrete beam without cutting the steel reinforcement. we will hire an engineer to inspect the structure as per code · 98 m away
- 5105 Orleans CtOct 28, 2025Installing overhead mast and 200 amp meter socket · 101 m away
- 5107 Orleans CtAug 12, 2024Gas line for generator · 106 m away
- 5204 Kings HwyAug 30, 2024Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 1804 Jentsch CtSep 6, 2024Replacement of an existing water heater · 110 m away
- 1802 Jentsch CtSep 12, 2025Replacement of complete existing central heat and air system with or without duct work change out · 124 m away
- 1702 Fair Oaks DrDec 7, 2023Irrigation install · 126 m away
- 5012 Lansing DrAug 10, 2026Increasing opening size for larger window adding a header for support. existing window is 48x42 new windows is 87x42 · 136 m away
- 1708 Fair Oaks DrApr 23, 2026Install level 2 ev charger · 143 m away
- 1800 Jentsch CtSep 15, 2025Replacement of an existing water heater 40 gal gas located in the garage · 147 m away
- 5014 Lansing DrMar 27, 2025Gas work for standby generator need to update to new plumber · 149 m away