Electrical service upgrade permitted at 513 Blackberry Dr
An electrical permit indicates an upgrade to the existing service at 513 Blackberry Dr. The City of Austin issued the permit on September 11, 2026; its status is final.
Summarized from City of Austin records · updated Sep 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 11, 2026
- since Sep 11, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade existing old service
- AppliedSep 8, 2026
- IssuedSep 11, 2026
- WorkSep '26 – Sep '26
- Final inspectionSep 16, 2026
Passed final inspection Sep 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade existing old service
Upgrade existing old service
City of Austin permitElectrical PermitFinal- Record
- 2026-117372 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 513 Blackberry Dr
What work is happening at 513 Blackberry Dr?
A City of Austin electrical permit describes an upgrade to the existing service. The permit was issued September 11, 2026.
Is a new home being built at 513 Blackberry Dr?
The available record is for an electrical service upgrade, not a new-home construction permit.
When was the electrical permit for 513 Blackberry Dr issued?
The permit was issued on September 11, 2026.
What is the permit number for 513 Blackberry Dr?
The City of Austin permit number is 2026-117372 EP.
Is the 513 Blackberry Dr permit approved or complete?
The permit record lists its status as final.
Also being built nearby
All of 78745- 515 Blackberry DrJan 9, 2025Main panel upgrade · 18 m away
- 7513 Elderberry DrDec 15, 2025Replacement of an existing water heater replace like/like g water heater · 53 m away
- 507 Blackberry DrMar 13, 2024Replace water heater · 56 m away
- 521 Blackberry DrJul 21, 2025Replacement of an existing water heater · 73 m away
- 7410 Shadywood DrJun 5, 2026Gas line inspection per email from plumber texas gas locked meter due to gas leak. we went and fixed the gas line. customer does not have gas and requires the gas test to be completed for reconnection of services · 86 m away
- 7509 Elderberry DrApr 16, 2024Replacement of an existing water heater · 89 m away
- 525 Blackberry DrAug 8, 2025Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 7403 Ferndale CirAug 11, 2025Express: uninstall 8 existing windows and replace with 8 new windows of same size; like for like install · 126 m away
- 604 Elderberry CvOct 23, 2024Irrigation installation · 132 m away
- 7318 Shadywood DrNov 20, 2023Replacement of an existing water heater · 142 m away
- 601 Blackberry DrDec 22, 2023Upgrade of full underground service. installation of 26kw generator with 200amp ats · 178 m away
- 7408 Lunar DrMay 6, 2025Shower only tub to tub like for like remodeling · 181 m away