5208 Buffalo Pass
Austin, TX 78745
5208 Buffalo Pass: 3 projects on record
City of Austin lists 3 filings across 3 projects at 5208 Buffalo Pass, Austin, TX 78745. The most recent, filed February 8, 2024, covers: “Outdated main electrical panel no spaces available to add future breakers if they were needed this old electrical panel is installed after the automatic transfer switch so it dont need to disconnect any wires or remove the meter just shut off the ats”.
Compiled from City of Austin records · updated Feb 8, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Feb 8, 2024
- since Feb 8, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledOutdated main electrical panel no spaces available to add future breakers if they were needed this old electrical panel is installed after the automatic transfer switch so it dont need to disconnect any wires or remove the meter just shut off the ats
- AppliedFeb 5, 2024
- IssuedFeb 8, 2024
- WorkFeb '24 – Feb '24
- Final inspectionFeb 15, 2024
Passed final inspection Feb 15, 2024.
1 contact on this project · 1 phone number
Permit & project history
3 projectsOutdated main electrical panel no spaces available to add future breakers if they were needed this old electrical panel is installed after the automatic transfer switch so it dont need to disconnect any wires or remove the meter just shut off the ats
Outdated main electrical panel no spaces available to add future breakers if they were needed this old electrical panel is installed after the automatic transfer switch so it dont need to disconnect any wires or remove the meter just shut off the ats
City of Austin permitElectrical PermitFinal- Record
- 2024-014497 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Adding a rooftop solar system to an existing residence
Adding a rooftop solar system to an existing residence
City of Austin permitElectrical PermitFinal- Record
- 2023-091398 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing a level 2 electric vehicle charger to existing residence
Installing a level 2 electric vehicle charger to existing residence
City of Austin permitElectrical PermitFinal- Record
- 2023-091393 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5208 Buffalo Pass
What is being built at 5208 Buffalo Pass?
The latest filing (City of Austin permit 2024-014497 EP, February 8, 2024) covers outdated main electrical panel no spaces available to add future breakers if they were needed this old electrical panel is installed after the automatic transfer switch so it dont need to disconnect any wires or remove the meter just shut off the ats.
How many permits and filings does 5208 Buffalo Pass have?
3 filings across 3 projects, from February 8, 2024 to February 8, 2024.
Is there other construction near 5208 Buffalo Pass?
Yes. Nearby filings include 5204 Buffalo Pass (repair main service got damaged for falling tree over service loop and pull the riser and meter of the wall, Aug 13, 2026); 2311 Fair Oaks Dr (upgrade exterior meter and panel, Jul 15, 2024); 5213 Buffalo Pass (garage conversion, May 5, 2026).
How do I get alerts for new permits at 5208 Buffalo Pass?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5204 Buffalo PassAug 13, 2026Repair main service got damaged for falling tree over service loop and pull the riser and meter of the wall · 48 m away
- 2311 Fair Oaks DrJul 15, 2024Upgrade exterior meter and panel · 51 m away
- 5213 Buffalo PassMay 5, 2026Garage conversion · 70 m away
- 5202 Buffalo PassMay 16, 2025Eplan: residential expedited review - addition and remodel to existing 2-story single family res. work to include: garage conversion for utility room. interior remodel and include scope of work from express permit 2024-100250 bp foundation repair 2024-051152 bp · 73 m away
- 2310 Southern Oaks DrApr 10, 2025Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 2307 Fair Oaks DrAug 26, 2025Replace 2 existing windows same for same · 103 m away
- 5301 Buffalo PassAug 25, 2026Replacing all blown-in attic insulation garage and laundry room drywall the garage fire-rated exterior door and the existing water heater with a new tankless unit. the work also includes installing a new utility sink in the laundry room twenty (20) recessed led can lights and two (2) led garage light fixtures. revision approved to add mechanical permit 8/25/26. replacing all ductwork and relocating existing unit to attic · 106 m away
- 5102 Buffalo PassMay 30, 2024Express: replace 9 windows like for like · 115 m away
- 5203 Buffalo PassMay 26, 2025Trench for sewer line replacement · 116 m away
- 5303 Buffalo PassJul 29, 2026Base: installing a backup battery system and additional meter socket · 128 m away
- 5100 Buffalo PassNov 13, 202560 tunnel below the foundation to replace entire drain system. 2 access holes - front back · 135 m away
- 2313 Southern Oaks DrNov 10, 2025Tunnel up to 63 under the foundation to repair break on the drain line · 136 m away