groundranger
Active · latest filing Oct 2026Residential

6007 West Gate Blvd

Austin, TX 78745

Electrical and plumbing work permitted at 6007 West Gate Blvd

City of Austin permits record electrical and plumbing work at this residence. The electrical permit, filed September 8, 2025, covers a 200-amp panel, service wire replacement, and a hard-wired EV charger; a plumbing permit filed October 21, 2026, covers a water service line replacement and water heater change-out.

Summarized from City of Austin records · updated Oct 21, 2026

Projects
2
2 filings
Latest filing
Oct 21, 2026
since Sep 8, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

30 foot water service line replaced and a water heater change out 6007 west gate boulevard austin tx 78745

  1. AppliedOct 20, 2026
  2. IssuedOct 21, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
16% through of the permit windowOct 21, 2026 → Apr 20, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. 30 foot water service line replaced and a water heater change out 6007 west gate boulevard austin tx 78745

    30 foot water service line replaced and a water heater change out 6007 west gate boulevard austin tx 78745

    City of Austin permitPlumbing PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect and reconnect. we will be replace a 125 panel to a 200 amp panel. replacing al service wire for cu. installing a new hard wired ev charger for rebate

    Request to disconnect and reconnect. we will be replace a 125 panel to a 200 amp panel. replacing al service wire for cu. installing a new hard wired ev charger for rebate

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6007 West Gate Blvd

What work is permitted at 6007 West Gate Blvd?

City of Austin permits cover electrical upgrades, a hard-wired EV charger, replacement of a water service line, and a water heater change-out.

Is a new building going up at 6007 West Gate Blvd in Austin?

The records provided describe electrical and plumbing work at a residence, not construction of a new building.

When was the electrical work permitted at 6007 West Gate Blvd?

The electrical permit was filed September 8, 2025. Permit 2025-113097 EP covers a panel upgrade, service wire replacement, and a hard-wired EV charger.

What plumbing work is planned at 6007 West Gate Blvd?

Permit 2026-137816 PP covers replacement of a 30-foot water service line and a water heater change-out. It was filed October 21, 2026.

Is there an EV charger planned at 6007 West Gate Blvd?

The September 8, 2025 electrical permit describes installation of a hard-wired EV charger.

What does permit 2026-137816 PP cover?

The City of Austin plumbing permit covers replacing a 30-foot water service line and changing out a water heater at 6007 West Gate Blvd.

Also being built nearby

All of 78745
Email me when it passes final inspection