603 Blueberry Hill
Austin, TX 78745
603 Blueberry Hill: 2 projects on record
City of Austin lists 2 filings across 2 projects at 603 Blueberry Hill, Austin, TX 78745. The most recent, filed July 11, 2024, covers: “Permit required for outage. ****outage needed to tie in solar system. please reference auxiliary permit 2024-078291 ep and install evse”.
Compiled from City of Austin records · updated Jul 11, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jul 11, 2024
- since Jul 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledPermit required for outage. ****outage needed to tie in solar system. please reference auxiliary permit 2024-078291 ep and install evse
- AppliedJul 10, 2024
- IssuedJul 11, 2024
- WorkJul '24 – Aug '24
- Final inspectionAug 2, 2024
Passed final inspection Aug 2, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsPermit required for outage. ****outage needed to tie in solar system. please reference auxiliary permit 2024-078291 ep and install evse
Permit required for outage. ****outage needed to tie in solar system. please reference auxiliary permit 2024-078291 ep and install evse
City of Austin permitElectrical PermitFinal- Record
- 2024-085503 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Solar system to be interconnected ith the austin energy grid
Solar system to be interconnected ith the austin energy grid
City of Austin permitElectrical PermitFinal- Record
- 2024-078291 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 603 Blueberry Hill
What is being built at 603 Blueberry Hill?
The latest filing (City of Austin permit 2024-085503 EP, July 11, 2024) covers permit required for outage. ****outage needed to tie in solar system. please reference auxiliary permit 2024-078291 ep and install evse.
How many permits and filings does 603 Blueberry Hill have?
2 filings across 2 projects, from July 11, 2024 to July 11, 2024.
Is there other construction near 603 Blueberry Hill?
Yes. Nearby filings include 605 Blueberry Hill (replacement of complete existing central heat and air system with or without duct work maurico cojulum, Dec 18, 2025); 509 Blueberry Hill (express: foundation repair, Sep 23, 2026); 604 Blueberry Hill (replacement of an existing water heater, Jan 9, 2025).
How do I get alerts for new permits at 603 Blueberry Hill?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 605 Blueberry HillDec 18, 2025Replacement of complete existing central heat and air system with or without duct work maurico cojulum · 20 m away
- 509 Blueberry HillSep 23, 2026Express: foundation repair · 39 m away
- 604 Blueberry HillJan 9, 2025Replacement of an existing water heater · 49 m away
- 508 Blueberry HillOct 9, 2026Garage conversion and retropermit covered porch · 54 m away
- 507 Blueberry HillMay 9, 2025Express replace 3 size for size windows · 58 m away
- 503 Blueberry HillJul 17, 2024Replacing service panel and meter can · 97 m away
- 6114 S 1st StApr 9, 2025I am replacing a rpz · 107 m away
- 500 Blueberry HillJan 15, 2024Express existing foundation repair · 115 m away
- 6311 S 1st StFeb 9, 2026Eplan: expedited review - new construction of dumpster enclosure for multi-family mixed use complex (189 sq ft) · 125 m away
- 410 Blueberry HillMay 2, 2025Express: foundation repair · 132 m away
- 512 Eberhart LnSep 29, 2026Replacement of complete existing central heat and air system with or without duct work · 149 m away
- 408 Blueberry HillOct 1, 2024Express: fire loss general demolition framing repairs roof replacement plumbing electrical hvac siding drywall insulation cabinets finish carpentry repairs. pant · 150 m away
More solar installs in 78745.