6214 Woodhue Dr
Austin, TX 78745
6214 Woodhue Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 6214 Woodhue Dr, Austin, TX 78745. The most recent, filed June 7, 2024, covers: “Replacement of an existing water heater with a customer supplied water heater”.
Compiled from City of Austin records · updated Jun 7, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 7, 2024
- since Jun 7, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of an existing water heater with a customer supplied water heater
- AppliedJun 6, 2024
- IssuedJun 7, 2024
- !WorkJun '24 – Dec '24
- Final inspection
Marked expired Dec 8, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater with a customer supplied water heater
Replacement of an existing water heater with a customer supplied water heater
City of Austin permitPlumbing PermitExpired- Record
- 2024-071630 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6214 Woodhue Dr
What is being built at 6214 Woodhue Dr?
The latest filing (City of Austin permit 2024-071630 PP, June 7, 2024) covers replacement of an existing water heater with a customer supplied water heater.
How many permits and filings does 6214 Woodhue Dr have?
1 filing across 1 project, from June 7, 2024 to June 7, 2024.
Is there other construction near 6214 Woodhue Dr?
Yes. Nearby filings include 6213 Amber Pass (replacement of complete existing central heat and air system with or without duct work replacing like for like vertical 2.5t gas system, Nov 10, 2025); 6234 Boxcar Run (express: replace 4 windows like for like replace front door replace all ceiling fans install vent hood master bath renovation- new sink and toilet (tub to shower) hall bath renovation-new sink and dropping in new bathtub tiling surround adding some recessed lighting in the hallway and few wall sconces in living room, Jan 20, 2025); 6232 Boxcar Run (replacement of an existing water heater, Oct 31, 2024).
How do I get alerts for new permits at 6214 Woodhue Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 6213 Amber PassNov 10, 2025Replacement of complete existing central heat and air system with or without duct work replacing like for like vertical 2.5t gas system · 33 m away
- 6234 Boxcar RunJan 20, 2025Express: replace 4 windows like for like replace front door replace all ceiling fans install vent hood master bath renovation- new sink and toilet (tub to shower) hall bath renovation-new sink and dropping in new bathtub tiling surround adding some recessed lighting in the hallway and few wall sconces in living room · 60 m away
- 6232 Boxcar RunOct 31, 2024Replacement of an existing water heater · 75 m away
- 1400 Chippeway LnNov 21, 2024Change out water heater to existing residence only · 76 m away
- 6205 Amber PassJul 28, 2025Replacement of an existing water heater standard 40 gal natural gas water heater change out 6205 amber pass austin tx 78745 · 76 m away
- 1402 Chippeway LnApr 1, 2024Gas work for installing a 22kw home standby generator · 77 m away
- 6207 Woodhue DrJul 27, 2026Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 6210 Amber PassFeb 16, 2024*request to disconnect* replace main panel located in back of house. no meter work required · 81 m away
- 6204 Woodhue DrOct 19, 2026Base: installing a backup battery system and additional meter socket · 87 m away
- 6300 Libyan DrSep 21, 2026Interior remodel of single family residence: expansion of kitchen and laundry room into existing garage removal of wall between living & dinning room. replacement of exterior door & windows for same size. new gas & water lines for kitchen. hvac work. remodel of kitchen/living/dining · 90 m away
- 6308 Libyan DrJun 24, 2026Addition to existing 1-story single family residence master bedroom extension 3 bed/2 bath · 96 m away
- 1500 Chippeway LnApr 4, 2024Upgrade the existing underground service to 200amps with a new meter can and new main panel · 100 m away