groundranger
Historic · latest filing Jul 2024Residential

6404 King George Dr

Austin, TX 78745

6404 King George Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 6404 King George Dr, Austin, TX 78745. The most recent, filed July 16, 2024, covers: “50 tunnel below the foundation to replace cast-iron drain system. 2 access holes - 1 front and 1 in back”.

Compiled from City of Austin records · updated Jul 16, 2024

Projects
1
1 filings
Latest filing
Jul 16, 2024
since Jul 16, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

50 tunnel below the foundation to replace cast-iron drain system. 2 access holes - 1 front and 1 in back

  1. AppliedJun 24, 2024
  2. IssuedJul 16, 2024
  3. WorkJul '24 – Aug '24
  4. Final inspectionAug 16, 2024

Passed final inspection Aug 16, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. 50 tunnel below the foundation to replace cast-iron drain system. 2 access holes - 1 front and 1 in back

    50 tunnel below the foundation to replace cast-iron drain system. 2 access holes - 1 front and 1 in back

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6404 King George Dr

What is being built at 6404 King George Dr?

The latest filing (City of Austin permit 2024-078857 PP, July 16, 2024) covers 50 tunnel below the foundation to replace cast-iron drain system. 2 access holes - 1 front and 1 in back.

How many permits and filings does 6404 King George Dr have?

1 filing across 1 project, from July 16, 2024 to July 16, 2024.

What is being built near National Church Residences Of Austin TX in Austin?

6404 King George Dr is about 92 m from National Church Residences Of Austin TX (808 Eberhart Lane). Its latest filing is for 50 tunnel below the foundation to replace cast-iron drain system. 2 access holes - 1 front and 1 in back.

Is there other construction near 6404 King George Dr?

Yes. Nearby filings include 6406 King George Dr (new accessory structure in rear yard with living space and kitchenette, Jan 21, 2025); 6410 Middleham Pl (replacement of existing sanitary sewer drain system for two bathrooms (6 plumbing openings). installation of 30 sewer line, Feb 23, 2026); 803 Eberhart Ln (tunnel approximately 10 to replace the section of damaged sewer pipe, Nov 16, 2026).

How do I get alerts for new permits at 6404 King George Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Email me when a new permit is filed