6405 Circle S Rd
Austin, TX 78745 · Austin Independent School District
Pleasant Hill Elementary to get a secured entry vestibule
A renovation at Pleasant Hill Elementary will add a secured vestibule in the school’s existing administration and main entry area. Austin issued the building permit on May 1, 2025, followed by electrical and mechanical permits on May 2, 2025. The project’s TDLR registration lists an estimated cost of $189,000.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated May 2, 2025
- Projects
- 6
- 6 filings
- Latest filing
- May 2, 2025
- since Nov 23, 2009
- Largest scope
- 1,000 sf
- Estimated cost
- $189K
- state registration
Where this project stands
FinaledRenovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
- AppliedApr 4, 2025
- IssuedMay 2, 2025
- WorkMay '25 – Jul '25
- Final inspectionJul 24, 2025
Passed final inspection Jul 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
6 projectsRenovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
City of Austin permitElectrical PermitFinal- Record
- 2025-050260 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
City of Austin permitMechanical PermitFinal- Record
- 2025-050260 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
City of Austin permitBuilding PermitFinal- Record
- 2025-050260 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Gas line repair at aisd pleasant hill elementary
Gas line repair at aisd pleasant hill elementary
City of Austin permitPlumbing PermitFinal- Record
- 2025-028971 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consists of access control and technology upgrades along with minor interior finishes, mechanical, and electrical scope. — pleasant hill elementary school
TDLR project registrationRenovation/AlterationProject Closed1,000 sq ft$189K est.- Project #
- TABS2025007424
- Tenant / owner
- Pleasant Hill Elementary School Secure Vestibule
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 6405 Circle S Rd
What is being built at 6405 Circle S Rd?
Permits indicate a renovation of Pleasant Hill Elementary’s existing administration and main entry area to create a secured vestibule for students and staff.
Is Pleasant Hill Elementary getting a new building?
The records describe renovations to the school’s existing entry and administration area, not construction of a new school building.
When was the secured vestibule project permitted?
The building permit, 2025-050260 BP, was issued May 1, 2025. Electrical and mechanical permits 2025-050260 EP and 2025-050260 MP followed on May 2, 2025.
What work is planned for the school entrance?
The project description includes access-control and technology security upgrades, along with minor interior, mechanical, and electrical work.
How much will the Pleasant Hill Elementary vestibule project cost?
The TDLR project registration lists an estimated cost of $189,000. This is the applicant’s estimate for the project.
How large is the Pleasant Hill Elementary vestibule project?
The TDLR registration lists 1,000 square feet for the renovation.
Also being built nearby
All of 78745- 6501 S Congress AveJan 17, 2024Tenant improvement of shell space to include 1 new bathroom · 128 m away
- 6501 Congress AveNov 22, 2013Circle s. road · 128 m away
- 6400 S Congress AveSep 30, 2025Service rack and feeder pipe busted. replacement of broken components (4x4 post and pvc conduit) as per inspectors and power company request · 149 m away
- 6434 S Congress AveOct 14, 2024Dig 35 ft to repair sewerline access left side of building · 164 m away
- 305 North Bluff DrJan 28, 2025Cap off water and waste water · 185 m away
- 6510 S Congress AveSep 19, 2024Re-roof · 209 m away
- 6521-1/2 Congress AveOct 19, 2010Clear- tx- aus0098 6400 s. congress · 210 m away
- 6413 Starstreak DrFeb 24, 2025Replacement of complete existing central heat and air system with or without duct work hvac system change out - installing 3.5 ton day and night gas system · 211 m away
- 200 North Bluff DrMar 13, 2025Change of use · 241 m away
- 6406 Starstreak DrApr 5, 2024Replacement of complete existing central heat and air system with or without duct work · 248 m away
- 401 North Bluff DrJul 22, 2026New 2-story duplex unit 6101 2bdr 2.5 bath new 2-story duplex unit 6102 2 bdr 2.5 bath · 251 m away
- 6408 Starstreak DrMay 30, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace current system with new 3 ton single stage goodman system · 252 m away