Foundation repair and new driveway approach at 6507 Pevensey Dr
City of Austin records show a permit for foundation repair filed April 27, 2026, and a permit for a new 17-foot driveway approach filed August 10, 2026. Both permits are marked final.
Summarized from City of Austin records · updated Aug 10, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 10, 2026
- since Apr 27, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new driveway approach of 17 ft
- AppliedJul 16, 2026
- IssuedAug 10, 2026
- WorkAug '26 – Aug '26
- Final inspectionAug 18, 2026
Passed final inspection Aug 18, 2026.
Permit & project history
2 projectsConstruct new driveway approach of 17 ft
Construct new driveway approach of 17 ft
City of Austin permitDriveway / SidewalksFinal- Record
- 2026-091903 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2026-049638 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6507 Pevensey Dr
What is being built at 6507 Pevensey Dr?
City of Austin permits indicate foundation repair and construction of a new 17-foot driveway approach at the residential property.
When were permits filed for 6507 Pevensey Dr?
The foundation repair permit, 2026-049638 BP, was filed April 27, 2026. The driveway approach permit, 2026-091903 DS, was filed August 10, 2026.
What does permit 2026-091903 DS cover?
The August 10, 2026 permit covers construction of a new 17-foot driveway approach.
Is a new home being built at 6507 Pevensey Dr?
The records provided list a foundation repair permit and a driveway approach permit; they do not indicate a new home construction permit.
What work is happening near Eberhart Place?
Permits at 6507 Pevensey Dr, about 154 meters from Eberhart Place, indicate foundation repair and a new driveway approach.
Are the permits for 6507 Pevensey Dr final?
Both listed City of Austin permits are marked final: 2026-049638 BP for foundation repair and 2026-091903 DS for the driveway approach.
Also being built nearby
All of 78745- 6420 S 1st StFeb 21, 2025Replacing 4 zinsco panels inside and 4 zinsco main panels outside and upgrading to 150amp per unit as required by insurance company for policy renewal unit 101-104 · 61 m away
- 6513 Pevensey DrOct 21, 2025Replacement of an existing water heater 40gal gas water heater located in the kitchen area · 60 m away
- 6407 Middleham PlMar 5, 2025Express: foundation repair · 78 m away
- 6514 Pevensey DrSep 29, 2025Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 6517 Pevensey DrAug 15, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 96 m away
- 6516 Pevensey DrDec 27, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 6505 Middleham PlMar 20, 2024Replace exterior service and meter base. like for like · 103 m away
- 6519 Pevensey DrApr 24, 2026Tunnel under foundation approximately 30 feet to replace cast iron for 1 full bathroom only one access hole in the front right side of the entry way. sewer line replacement from the home to the city tap connection total of 30 feet · 114 m away
- 6410 Middleham PlFeb 23, 2026Replacement of existing sanitary sewer drain system for two bathrooms (6 plumbing openings). installation of 30 sewer line · 115 m away
- 6401 Middleham PlJan 19, 2026Express- existing foundation repair as per scope of work attached · 116 m away
- 6507 Middleham PlFeb 23, 2026Replace failed drain piping by tunnel to existing residence · 118 m away
- 6502 Middleham PlOct 6, 2026Level replace plumbing change sliding door to standard door new cabinets repair dry wall repaint replace windows replace siding open up living room space · 124 m away