A complete existing central heating and air system is being replaced at 7101 Moat Cv. The City of Austin permit was filed May 8, 2026, and is marked final.
Summarized from City of Austin records · updated May 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 8, 2026
- since May 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedApr 30, 2026
- IssuedMay 8, 2026
- WorkMay '26 – May '26
- Final inspectionMay 22, 2026
Passed final inspection May 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-054102 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7101 Moat Cv
What is being built at 7101 Moat Cv in Austin?
The City of Austin permit indicates a replacement of the home's complete existing central heating and air system. It does not describe new home construction.
When was the heating and air system replacement permitted?
The permit was filed May 8, 2026.
What is the permit number for 7101 Moat Cv?
The City of Austin permit number is 2026-054102 MP. Its status is listed as final.
Is a new house being built at 7101 Moat Cv?
The available permit describes replacement of an existing central heating and air system, not construction of a new house.
What work is happening at 7101 Moat Cv near Christ The King Presbyterian Church?
A City of Austin mechanical permit indicates replacement of the home's complete existing central heating and air system. The permit was filed May 8, 2026.
Also being built nearby
All of 78745- 7107 Sir Gawain DrMar 5, 2025Replacement of complete existing central heat and air system with or without duct work 1 system 3 ton gas furnace straight cool · 81 m away
- 7201 Sir Gawain DrFeb 20, 2025Express: replace windows and siding · 83 m away
- 7103 Sir Gawain DrJul 2, 2024Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 7205 Sir Gawain DrJan 30, 2026Express: foundation repair - installing steel piers · 106 m away
- 706 Prince Arn DrSep 8, 2026Express - replace 3 windows · 108 m away
- 7200 Sir Gawain DrApr 20, 202610 tunnel below the foundation to repair break on first wye on system. 1 access hole on left side · 125 m away
- 7207 Sir Gawain DrJun 26, 2026Express: replace 6 windows (like for like) · 132 m away
- 7209 Sir Gawain DrJan 8, 2026Addition of approximately 900 sq ft to sfr. interior remodel of home to increase the size of the living room kitchen primary suite and secondary bedroom. new interior partitions fixtures and finishes · 143 m away
- 7107 Barnsdale WaySep 3, 2025Tunnel under slab 6ft to repair drain line main line service backed up no access to toilets · 160 m away
- 7006 Sir Gawain Drive · Christ The King Presbyterian ChurchApr 18, 2025Christ the king church — additions to existing building — 1,244 gsf one-story addition to an existing 4,600 gsf one-story church and approximately 1,050 square feet of interior renovation within the existing church. work includes new restrooms, breakroom, lobby, and classroom · 175 m away
- 511 Teaberry CirApr 22, 2026Express: foundation repair · 180 m away
- 604 Mulberry DrAug 5, 2026Replacement of complete existing central heat and air system with or without duct work · 181 m away