7103 Lunar Dr
Austin, TX 78745
7103 Lunar Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7103 Lunar Dr, Austin, TX 78745 since December 2, 2024. The most recent, filed February 3, 2025, covers: “Patio cover addition”.
Compiled from City of Austin records · updated Feb 3, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Feb 3, 2025
- since Dec 2, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledPatio cover addition
- AppliedAug 8, 2024
- IssuedFeb 3, 2025
- WorkFeb '25 – Mar '25
- Final inspectionMar 7, 2025
Passed final inspection Mar 7, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsPatio cover addition
Patio cover addition
City of Austin permitElectrical PermitFinal- Record
- 2024-156162 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Patio cover addition
Patio cover addition
City of Austin permitBuilding PermitFinal- Record
- 2024-156162 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7103 Lunar Dr
What is being built at 7103 Lunar Dr?
The latest filing (City of Austin permit 2024-156162 EP, February 3, 2025) covers patio cover addition.
How many permits and filings does 7103 Lunar Dr have?
2 filings across 2 projects, from December 2, 2024 to February 3, 2025.
Is there other construction near 7103 Lunar Dr?
Yes. Nearby filings include 315 Kimberly Dr (replacement of complete existing central heat and air system with or without duct work, Jul 1, 2024); 313 Kimberly Dr (replacement of an existing water heater, Dec 21, 2023); 7107 Tawny Cir (replacement of mini-split system installed minisplit in garage, Mar 6, 2025).
How do I get alerts for new permits at 7103 Lunar Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 315 Kimberly DrJul 1, 2024Replacement of complete existing central heat and air system with or without duct work · 33 m away
- 313 Kimberly DrDec 21, 2023Replacement of an existing water heater · 38 m away
- 7107 Tawny CirMar 6, 2025Replacement of mini-split system installed minisplit in garage · 98 m away
- 7103 Tawny CirFeb 7, 2025Upgrade main electric service to 200 amps - underground replace sub panel · 98 m away
- 7111 Tawny CirOct 23, 2026Replacement of an existing water heater 40-gallon gas water heater location in garage closet · 108 m away
- 305 Cloudview DrJul 12, 2024Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 303 Tawny DrSep 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical gas system · 117 m away
- 309 Cloudview DrAug 26, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 3.5-ton gas hvac system like-for-like · 118 m away
- 301 Cloudview DrAug 22, 2024Install new _7.2__kw rooftop solar system to existing residential only using line side tap · 124 m away
- 322 Meadow Lea DrMay 24, 2024Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 7106 Tawny CirJul 1, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 126 m away
- 313 Cloudview DrJun 17, 202512ft tunnel entry point from the entry way front of the house to the back master bedroom bath repairing pvc pipe · 134 m away