7103 Twisted Oaks Dr
Austin, TX 78745
Backup battery system and meter socket permitted at 7103 Twisted Oaks
An active Austin electrical permit dated November 4, 2026, covers installation of a backup battery system and an additional meter socket at 7103 Twisted Oaks Dr. Earlier permits cover a 125-amp underground service rebuild and a garage-door change as part of an interior remodel.
Summarized from City of Austin records · updated Nov 4, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Nov 4, 2026
- since Dec 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayBase: installing a backup battery system and additional meter socket
- AppliedAug 6, 2026
- IssuedNov 4, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
3 projectsBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-102594 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
125-amp underground service rebuild
125-amp underground service rebuild
City of Austin permitElectrical PermitFinal- Record
- 2026-101631 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel convert a 2 car garage door into 1 garage door
Interior remodel convert a 2 car garage door into 1 garage door
City of Austin permitBuilding PermitFinal- Record
- 2025-161759 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7103 Twisted Oaks Dr
What is being built at 7103 Twisted Oaks Dr in Austin?
An active electrical permit indicates that a backup battery system and an additional meter socket are being installed. The permit, 2026-102594 EP, was filed November 4, 2026.
Is there a new battery system planned for 7103 Twisted Oaks Dr?
Yes. Permit 2026-102594 EP describes installation of a backup battery system and an additional meter socket. It was filed November 4, 2026, and is listed as active.
What electrical work has been permitted at 7103 Twisted Oaks Dr?
Permits cover a 125-amp underground service rebuild, filed August 10, 2026, and installation of a backup battery system and additional meter socket, filed November 4, 2026. The service rebuild permit is listed as final.
Was a garage remodeled at 7103 Twisted Oaks Dr?
A building permit filed December 26, 2025, describes an interior remodel converting a two-car garage door into one garage door. Permit 2025-161759 BP is listed as final.
What are the permit numbers for work at 7103 Twisted Oaks Dr?
The three permits are 2025-161759 BP for the garage-door change, 2026-101631 EP for the 125-amp underground service rebuild, and 2026-102594 EP for the backup battery system and additional meter socket.
Also being built nearby
All of 78745- 7104 Twisted Oaks DrSep 4, 2025Upgrade to 200 amp underground service · 47 m away
- 2307 Mimosa DrJun 13, 2025Express: foundation repair · 62 m away
- 7112 Twisted Oaks DrAug 3, 2026Replacement of an existing water heater · 82 m away
- 2304 Matthews LnMar 6, 2024Replacement of an existing water heater · 96 m away
- 7107 Whispering Oaks DrMar 18, 2025Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 7111 Whispering Oaks DrOct 6, 2026Installation of 5.72kw solar pv system with battery backup · 121 m away
- 7100 Grigsby DrAug 26, 2025New pool · 123 m away
- 7010 Whispering Oaks DrSep 28, 2026Replacement of complete existing central heat and air system with or without duct work like for like 2.5t vertical gas · 133 m away
- 7203 Southwind DrOct 8, 2024New solar panel installation. installation of a 5.25kw solar installation. via backfed breaker · 134 m away
- 7204 Twisted Oaks DrJun 5, 2025Run 1 poly gas line in trench to generator run 60 gas line in trench to firepit location outside · 138 m away
- 7207 Twisted Oaks DrMar 21, 2024Replacement of complete existing central heat and air system with or without duct work · 145 m away
- 7209 Whispering Winds DrFeb 18, 2025Upgrade service to 200a (underground feed) · 146 m away