8104 Nottaway Cv
Austin, TX 78745
8104 Nottaway Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 8104 Nottaway Cv, Austin, TX 78745. The most recent, filed November 21, 2024, covers: “Replace water heater with tankless to existing residence only”.
Compiled from City of Austin records · updated Nov 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 21, 2024
- since Nov 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace water heater with tankless to existing residence only
- AppliedMar 20, 2013
- IssuedNov 21, 2024
- WorkNov '24 – May '25
- Final inspectionDec 9, 2024
Passed final inspection Dec 9, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace water heater with tankless to existing residence only
Replace water heater with tankless to existing residence only
City of Austin permitPlumbing PermitFinal- Record
- 2013-027671 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8104 Nottaway Cv
What is being built at 8104 Nottaway Cv?
The latest filing (City of Austin permit 2013-027671 PP, November 21, 2024) covers replace water heater with tankless to existing residence only.
How many permits and filings does 8104 Nottaway Cv have?
1 filing across 1 project, from November 21, 2024 to November 21, 2024.
Is there other construction near 8104 Nottaway Cv?
Yes. Nearby filings include 8106 Nottaway Cv (express: replace 8 windows and 4 doors like for like, May 16, 2024); 8100 Nottaway Cv (replace oh 200a electrical service, Apr 22, 2026); 3202 Oak Aly (replacement of complete existing central heat and air system with or without duct work, May 24, 2024).
How do I get alerts for new permits at 8104 Nottaway Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 8106 Nottaway CvMay 16, 2024Express: replace 8 windows and 4 doors like for like · 19 m away
- 8100 Nottaway CvApr 22, 2026Replace oh 200a electrical service · 50 m away
- 3202 Oak AlyMay 24, 2024Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 3205 China GroveApr 22, 2024Express: foundation repair as per scope of work attached · 94 m away
- 3209 Darnell DrSep 29, 2026Approx. 35 feet of tunnel under home to repair sewer line with access starting in the front of the home · 97 m away
- 3107 Darnell DrJun 18, 2026Will be upgrading main service to new 200 amp panel and new meter can · 99 m away
- 3207 China GroveJun 19, 2024Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 3211 Darnell DrOct 16, 2024Irrigation system installation · 111 m away
- 3206 China GroveMar 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas system · 115 m away
- 3213 Darnell DrDec 19, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton two stage dual-fuel system · 121 m away
- 3209 China GroveAug 11, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas · 127 m away
- 3110 Darnell DrJun 23, 2026Express - exterior: siding windows doors interior: remodel kitchen 2 baths flooring and drywall repair sewer line under slab foundation repair. revision- electrical work for smoke detectors · 130 m away