City of Austin lists 1 filing across 1 project at 811 Huntingdon Pl, Austin, TX 78745. The most recent, filed July 12, 2024, covers: “Excavate 45 to replace sewer yard line”.
Compiled from City of Austin records · updated Jul 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 12, 2024
- since Jul 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExcavate 45 to replace sewer yard line
- AppliedJul 2, 2024
- IssuedJul 12, 2024
- WorkJul '24 – Jan '25
- Final inspectionJan 27, 2025
Passed final inspection Jan 27, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectExcavate 45 to replace sewer yard line
Excavate 45 to replace sewer yard line
City of Austin permitPlumbing PermitFinal- Record
- 2024-082538 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 811 Huntingdon Pl
What is being built at 811 Huntingdon Pl?
The latest filing (City of Austin permit 2024-082538 PP, July 12, 2024) covers excavate 45 to replace sewer yard line.
How many permits and filings does 811 Huntingdon Pl have?
1 filing across 1 project, from July 12, 2024 to July 12, 2024.
Is there other construction near 811 Huntingdon Pl?
Yes. Nearby filings include 6911 Cooper Ln (replace 100 amp panels for unit 1 and unit 2 with new 100amp panels. a new 200 amp meter can will be required, Mar 17, 2026); 809 Plumpton Dr (replacement of a water heater, Nov 18, 2023); 804 Huntingdon Pl (replace the existing main distribution panel with a new 200/125 load center. install a new grounding electrode system with an intersystem bonding bridge if necessary, Jan 29, 2024).
How do I get alerts for new permits at 811 Huntingdon Pl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 6911 Cooper LnMar 17, 2026Replace 100 amp panels for unit 1 and unit 2 with new 100amp panels. a new 200 amp meter can will be required · 58 m away
- 809 Plumpton DrNov 18, 2023Replacement of a water heater · 64 m away
- 804 Huntingdon PlJan 29, 2024Replace the existing main distribution panel with a new 200/125 load center. install a new grounding electrode system with an intersystem bonding bridge if necessary · 68 m away
- 7001 Cooper LnMar 18, 2026Replace 100 amp panels for unit 1 and unit 2 with new 100amp panels. a new 200 amp meter can will be required · 79 m away
- 815 Buckingham PlMay 15, 2025Construct new driveway approach of 16 ft. no sidewalk inspection per plan review · 90 m away
- 802 Plumpton DrDec 31, 2025Replacement of an existing water heater 40gal gas tank located in the garage · 91 m away
- 904 Echo LnSep 14, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 92 m away
- 805 Buckingham PlOct 3, 2026Repair and reroute existing sewer line to city clean out · 96 m away
- 709 Huntingdon PlApr 2, 2024Repair 20 ft sewer line from front of house to before reaching sidewalk · 107 m away
- 708 Huntingdon PlNov 7, 2024Construct new driveway approach of 12 ft **no inspection per bp · 114 m away
- 801 Buckingham PlSep 10, 2025We will be rerouting the compromised sewer line requiring an arborist · 120 m away
- 707 Huntingdon PlOct 2, 2026Replacement of complete existing central heat and air system with or without duct work · 124 m away