821 Turtle Creek Blvd
Austin, TX 78745
Tub-to-shower conversion permitted at 821 Turtle Creek Blvd
Permits indicate a bathtub-to-shower conversion at 821 Turtle Creek Blvd, using a prefabricated acrylic shower unit and a new shower valve. The City of Austin issued the building and plumbing permits on November 20, 2025; both are marked final.
Summarized from City of Austin records · updated Nov 20, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 20, 2025
- since Nov 20, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress- replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space
- AppliedNov 20, 2025
- IssuedNov 20, 2025
- WorkNov '25 – Dec '25
- Final inspectionDec 4, 2025
Passed final inspection Dec 4, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsExpress- replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space
Express- replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space
City of Austin permitPlumbing PermitFinal- Record
- 2025-149289 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express- replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space
Express- replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space
City of Austin permitBuilding PermitFinal- Record
- 2025-149289 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 821 Turtle Creek Blvd
What is being changed at 821 Turtle Creek Blvd?
City permits indicate a bathtub is being replaced with a prefabricated acrylic shower unit, with a new shower valve.
When were permits issued for 821 Turtle Creek Blvd?
The City of Austin issued building permit 2025-149289 BP and plumbing permit 2025-149289 PP on November 20, 2025.
Is there a building permit for 821 Turtle Creek Blvd?
Yes. The City of Austin record lists building permit 2025-149289 BP, dated November 20, 2025, with final status.
Is plumbing work permitted at 821 Turtle Creek Blvd?
Yes. Plumbing permit 2025-149289 PP covers the tub-to-shower replacement and installation of a new shower valve. It is marked final.
Does the work at 821 Turtle Creek Blvd include electrical work?
The permit description says no electrical work is needed. It describes work in the wet space, including the shower replacement and valve.
Also being built nearby
All of 78745- 819 Turtle Creek BlvdMar 13, 2025Repair broken waste plumbing below the slab with the use of a tunnel · 21 m away
- 6104 Estates CvJan 22, 2025Install level 2 ev charger · 60 m away
- 6111 Cougar DrOct 13, 2026Tpole 2026-087329 bp · 59 m away
- 814 King AlbertMar 4, 2025Replacement of complete existing central heat and air system with or without duct work · 73 m away
- 813 Turtle Creek BlvdApr 28, 2025Replace federal pacific main panel and sub panel with updated panels of same size · 81 m away
- 6101 Estates CvNov 12, 2026Express: foundation repair (installing 28 exterior and 2 interior pilings) · 89 m away
- 812 King AlbertJan 9, 2025Emergency - replace meter service upgrade · 89 m away
- 6107 Cougar DrAug 26, 2025Express - exterior paint new shingles new windows new exterior doors and slider interior drywall patching/texture/paint lvp flooring doors kitchen cabinets and bathroom vanities sinks faucets and bathtub electrical rewire and internal panel replacement · 99 m away
- 6100 Estates CvJan 7, 2026Express- remove and replace 9 windows like for like. revision-replace 1 sliding glass door like for like · 111 m away
- 6103 Estates CvJul 20, 2026Express: foundation repair - installing 9 exterior pilings revision-plumbing work (full under house drain replacement) · 114 m away
- 6105 Cougar DrMar 17, 2024Replacement of mini-split system · 119 m away
- 809 Turtle Creek BlvdSep 8, 2026Tunnel under foundation to replace approximately 25ft of main line kitchen and hall guest bath sewer line · 119 m away