8703 Dandelion Trl
Austin, TX 78745
EV charging circuit and water heater permits at 8703 Dandelion Trl
Austin permits indicate a circuit for an electric vehicle charging station and a replacement water heater at this residence. The water heater permit was filed July 18, 2024, and the electrical permit was filed February 25, 2026; both are listed as final.
Summarized from City of Austin records · updated Feb 25, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 25, 2026
- since Jul 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled(gardner blake) - installation of circuit for elec. vehicle charging station - esip
- AppliedFeb 23, 2026
- IssuedFeb 25, 2026
- WorkFeb '26 – Aug '26
- Final inspectionMar 10, 2026
Passed final inspection Mar 10, 2026.
1 contact on this project
Permit & project history
2 projects(gardner blake) - installation of circuit for elec. vehicle charging station - esip
(gardner blake) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2026-021514 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-087183 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8703 Dandelion Trl
What is being built at 8703 Dandelion Trl?
Permits indicate installation of a circuit for an electric vehicle charging station and replacement of an existing water heater. The records do not describe a new building.
Is a new house being built at 8703 Dandelion Trl in Austin?
The available Austin permits concern a water heater replacement and an electrical circuit for an EV charging station, not construction of a new house.
When was the EV charging circuit permit filed at 8703 Dandelion Trl?
The City of Austin electrical permit, 2026-021514 EP, was filed February 25, 2026, and is listed as final.
When was the water heater permit filed at 8703 Dandelion Trl?
The City of Austin plumbing permit, 2024-087183 PP, was filed July 18, 2024, and is listed as final.
What is being done near Westgate/Davis on Dandelion Trl?
At 8703 Dandelion Trl, Austin permits indicate a replacement water heater and an electrical circuit for an EV charging station. The address is about 224 meters from Westgate/Davis at 3008 Davis Lane.
Also being built nearby
All of 78745- 8709 Dandelion TrlSep 18, 2026Replacement of complete existing central heat and air system with or without duct work · 36 m away
- 8608 Dandelion TrlNov 7, 2024Replacement of an existing water heater · 57 m away
- 8708 Dandelion TrlJan 23, 2025Replacement of an existing water heater · 68 m away
- 8609 Cretys CvMar 11, 2025Upgrade main electric service to 200 amps. new meter can and main breaker box. install 40 amp circuit for kiln · 88 m away
- 8703 Cretys CvAug 26, 2025Gas test · 94 m away
- 8714 Dandelion TrlDec 4, 2023Excavate the existing sewer line in-ground and replace it with sch 40 pvc- 35ft · 96 m away
- 8709 Cretys CvSep 16, 2026Demolition old driveway. construct new driveway approach of 17 ft · 107 m away
- 8606 Cretys CvDec 5, 2024Addition of existing 2 story sfr master suite and dining room addition. 4/3.5 · 131 m away
- 8608 Cretys CvDec 16, 2025Express- removal of rotting siding. installation of new sheathing and siding in its place. service disconnect/ reconnect to get behind electrical panel · 136 m away
- 8614 Piney Creek BndFeb 4, 2026Express: foundation repair - installing steel piers · 139 m away
- 8713 Cretys CvJan 24, 2024Replacement of complete existing central heat and air system with or without duct work · 144 m away
- 8645 Piney Creek BndAug 14, 2025Replacement of complete existing central heat and air system with or without duct work located in closet · 169 m away