900 Cougar Cv
Austin, TX 78745
Four-unit multifamily remodel at 900 Cougar Cv
City of Austin permits cover remodeling multifamily units A through D at 900 Cougar Cv. The building permit was filed Dec. 14, 2023, followed by plumbing and electrical permits in February 2024 and a mechanical permit on March 6, 2024. The work includes updated finishes and fixtures, replacement entry doors, and cedar overlays on existing stairs; the permit description says structural members will not be modified.
Summarized from City of Austin records · updated Mar 6, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Mar 6, 2024
- since Dec 14, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledMultifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors
- AppliedOct 1, 2023
- IssuedMar 6, 2024
- WorkMar '24 – Dec '24
- Final inspectionDec 31, 2024
Passed final inspection Dec 31, 2024.
1 contact on this project · 1 phone number
Permit & project history
4 projectsMultifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors
Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors
City of Austin permitMechanical PermitFinal- Record
- 2024-024633 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors
Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors
City of Austin permitElectrical PermitFinal- Record
- 2023-151735 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors
Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors
City of Austin permitPlumbing PermitFinal- Record
- 2023-151735 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors
Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors
City of Austin permitBuilding PermitFinal- Record
- 2023-151735 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 900 Cougar Cv
What is being built at 900 Cougar Cv in Austin?
City of Austin permits describe a remodel of multifamily units A through D, including new finishes, fixtures, and entry doors. The description also lists cedar overlays on existing stairs, with no changes to structural members.
When were permits filed for the 900 Cougar Cv remodel?
The building permit, 2023-151735 BP, was filed Dec. 14, 2023. Related plumbing and electrical permits were filed in February 2024, and mechanical permit 2024-024633 MP was filed March 6, 2024.
What work is planned at 900 Cougar Cv?
The permit description lists painting, cabinet doors, countertops, flooring, replacement tubs, sinks and faucets, light fixtures, electrical work for fan fixtures, and replacement entry doors. It also includes cedar overlays on existing stairs.
Is 900 Cougar Cv a new apartment building?
The records describe a multifamily remodel, not construction of a new apartment building. The work covers units A through D.
Are the 900 Cougar Cv remodel permits approved?
The four City of Austin permit records are marked Final. They were filed between Dec. 14, 2023, and March 6, 2024.
Also being built nearby
All of 78745- 5608 Cougar DrSep 2, 2026Replacing 5 windows like for like. existing multifamily · 28 m away
- 902 Cougar CvMar 6, 2024Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors · 31 m away
- 5609 Cougar DrMay 20, 2009Heatherwood — heatherwood · 43 m away
- 904 Cougar CvMar 6, 2024Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors · 53 m away
- 5704 Cougar DrMar 6, 2024Fourplex remodel - paint cabinets doors countertops flooring replace tub/sinks/faucets replace light fixtures) replace existing fence new cedar overlay on existing stairs (structural members not modified) replace entry doors carports. units abcd · 55 m away
- 906 Cougar CvMar 8, 2024Fourplex remodel - paint cabinets doors countertops flooring replace tub/sinks/faucets replace light fixtures) replace existing fence new cedar overlay on existing stairs (structural members not modified) replace entry doors carports. units abcd · 77 m away
- 5706 Cougar DrMar 6, 2024Fourplex remodel - paint cabinets doors countertops flooring replace tub/sinks/faucets replace light fixtures) replace existing fence new cedar overlay on existing stairs (structural members not modified) replace entry doors carports. units abcd · 78 m away
- 908 Cougar CvMar 6, 2024Fourplex remodel - paint cabinets doors countertops flooring replace tub/sinks/faucets replace light fixtures) replace existing fence new cedar overlay on existing stairs (structural members not modified) replace entry doors carports. units abcd · 99 m away
- 5800 Cougar DrMar 6, 2024Fourplex remodel - paint cabinets doors countertops flooring replace tub/sinks/faucets replace light fixtures) replace existing fence new cedar overlay on existing stairs (structural members not modified) replace entry doors carports. units abcd · 101 m away
- 905 Cougar CvMar 6, 2024Fourplex remodel - paint cabinets doors countertops flooring replace tub/sinks/faucets replace light fixtures) replace existing fence new cedar overlay on existing stairs (structural members not modified) replace entry doors carports. units abcd · 101 m away
- 5600 Nancy DrMar 2, 2007Nmf housing ii · 106 m away
- 5616 Nancy DrJan 6, 2026Replacement of an existing water heater replace 30-gallon gas water heater located in outside water heater closet · 109 m away