908 Sahara Ave
Austin, TX 78745
908 Sahara Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 908 Sahara Ave, Austin, TX 78745. The most recent, filed June 12, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jun 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 12, 2024
- since Jun 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 11, 2024
- IssuedJun 12, 2024
- WorkJun '24 – Jun '24
- Final inspectionJun 20, 2024
Passed final inspection Jun 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-073753 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 908 Sahara Ave
What is being built at 908 Sahara Ave?
The latest filing (City of Austin permit 2024-073753 MP, June 12, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 908 Sahara Ave have?
1 filing across 1 project, from June 12, 2024 to June 12, 2024.
What is being built near Austin ISD in Austin?
908 Sahara Ave is about 163 m from Austin ISD (1010 Turtle Creek Blvd). Its latest filing is for replacement of complete existing central heat and air system with or without duct work.
Is there other construction near 908 Sahara Ave?
Yes. Nearby filings include 1010 Sahara Ave (sandoval 39-58921 - install new _6.4__kw rooftop solar system to existing residential only using backfed breaker only, Apr 28, 2026); 907 Airoso Cv (multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors, Mar 6, 2024); 905 Airoso Cv (multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors, Mar 6, 2024).
How do I get alerts for new permits at 908 Sahara Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 1010 Sahara AveApr 28, 2026Sandoval 39-58921 - install new _6.4__kw rooftop solar system to existing residential only using backfed breaker only · 41 m away
- 907 Airoso CvMar 6, 2024Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors · 51 m away
- 905 Airoso CvMar 6, 2024Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors · 66 m away
- 906 Airoso CvMar 6, 2024Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors · 73 m away
- 1006 Sahara AveSep 9, 2024Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 5921 Cherry LoopDec 29, 2023Repair sewer line 50ft · 85 m away
- 5935 Cherry LoopMar 2, 2007Day care center · 112 m away
- 901 Airoso CvMar 6, 2024Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors · 120 m away
- 904 Airoso CvMar 6, 2024Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors · 130 m away
- 902 Airoso CvMar 6, 2024Multifamily remodel for units a b c d via paint cabinet doors countertops flooring replace tub/sink/faucets replace light fixtures install electrical for fan fixtures new cedar overlay on existing stairs (structural members not modified) & replace entry doors · 148 m away
- 5902 Cherry LoopDec 30, 2024Pull gas meter · 153 m away
- 822 Sahara AveMar 5, 2025Replacement of an existing water heater 40 gallon tall natural gas standard water heater replacement · 158 m away