1142 Lost Creek Blvd
Austin, TX 78746
Backup battery system permitted at 1142 Lost Creek Blvd
A backup battery system and additional meter socket are being installed at 1142 Lost Creek Blvd in Austin. The City of Austin issued active electrical permit 2026-135310 EP on October 30, 2026. Earlier site plan cases for Lost Creek Views were approved and released in 2014; the records do not specify what was built.
Summarized from City of Austin records · updated Oct 30, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Oct 30, 2026
- since Jan 2, 2014
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayBase: installing a backup battery system and additional meter socket
- AppliedOct 14, 2026
- IssuedOct 30, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
5 projectsBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-135310 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace windows like for like
Express: replace windows like for like
City of Austin permitBuilding PermitFinal- Record
- 2024-037887 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1142 Lost Creek Blvd
What is being built at 1142 Lost Creek Blvd?
An active City of Austin electrical permit describes installation of a backup battery system and an additional meter socket. Permit 2026-135310 EP was filed on October 30, 2026.
When was the permit filed for 1142 Lost Creek Blvd?
The City of Austin filed electrical permit 2026-135310 EP on October 30, 2026. Its status is listed as Active.
What is permit 2026-135310 EP for in Austin?
The permit is for installing a backup battery system and an additional meter socket at 1142 Lost Creek Blvd.
Were there earlier development plans for 1142 Lost Creek Blvd?
City of Austin site plan cases named Lost Creek Views were approved and released on January 2 and November 25, 2014. Another case, filed November 3, 2014, was withdrawn.
What is being permitted near Carpenter & Langford Office Renovation?
At 1142 Lost Creek Blvd, about 238 meters from the Carpenter & Langford Office Renovation, an active permit covers a backup battery system and additional meter socket. It was filed October 30, 2026.
What is happening near Las Cimas IV - Suite 125 Gym?
An electrical permit at 1142 Lost Creek Blvd, about 465 meters from Las Cimas IV - Suite 125 Gym, covers installation of a backup battery system and additional meter socket. The permit was filed October 30, 2026.
Also being built nearby
All of 78746- 1157 Lost Creek BlvdAug 14, 2024Interior remodel: remodel the first floor including living room dining room kitchen master bedroom bathroom structural modifications and new sliding doors-work/ subtype modified as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163 · 117 m away
- 916 S Capital Of Texas Hwy SbAug 18, 2026Install one illuminated sign for austin stone church · 161 m away
- 916 Capital Of Texas HwyMay 3, 2011Hills of lost creek, sec 6-a; resub of the remaining portion of lot 2 · 161 m away
- 1204 Wilson Heights DrAug 7, 2024Replacement of an existing water heater-work/ subtype modified as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163 · 168 m away
- 1206 Wilson Heights DrMar 22, 2024Replacement of complete existing central heat and air system with or without duct work-permit voided as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163 · 189 m away
- 912 S Capital Of Texas Hwy SbApr 14, 2025Interior non structural remodel of existing office space. [qt] · 220 m away
- 912 Capital Of Texas HwyMar 2, 2007Phoenix hill office building (rev #2) · 220 m away
- 1203 S Capital Of Texas Hwy · Eanes ISDApr 1, 2025Forest trail elementary restroom addition — additions to existing building — addition of a 500 sq ft restroom to existing elementary school buildings · 223 m away
- 1101 S. Capital Of Texas Hwy · Westlake Oaks Executive ParkNov 13, 2025Carpenter & langford office renovation — renovation/alteration — interior renovation · 238 m away
- 916 S. Capital Of Texas Hwy · The Austin Stone Community ChurchMar 6, 2025The austin stone west campus renovation & addition — renovation/alteration — phased interior renovations & alterations of the three existing structures on the campus. including new group restrooms, lobby expansion, classroom renovations, & auditorium expansion. the existing 2nd floor is to be renovated into additional classrm · 241 m away
- 912 S. Capital Of Texas Highway · Op Vista Ridge Property, LLCOct 6, 2025Authentic smiles — renovation/alteration — tenant finish-out · 252 m away
- 912 S. Capital Of TX Hwy · Op Vista Ridge Property,lcc C/O Oakpoint Luke PhillipsMar 8, 2024Hutson land planning — renovation/alteration — this project consists of the demolition and finish out of a newly demised tenant suite. suite occupancy classification and use group remains unchanged by scope of this work · 252 m away