1213 Havre Lafitte Dr
Austin, TX 78746
1213 Havre Lafitte Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1213 Havre Lafitte Dr, Austin, TX 78746. The most recent, filed March 22, 2024, covers: “Change gas line size running to stove”.
Compiled from City of Austin records · updated Mar 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 22, 2024
- since Mar 22, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledChange gas line size running to stove
- AppliedMar 20, 2024
- IssuedMar 22, 2024
- WorkMar '24 – Apr '24
- Final inspectionApr 5, 2024
Passed final inspection Apr 5, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectChange gas line size running to stove
Change gas line size running to stove
City of Austin permitPlumbing PermitFinal- Record
- 2024-035213 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1213 Havre Lafitte Dr
What is being built at 1213 Havre Lafitte Dr?
The latest filing (City of Austin permit 2024-035213 PP, March 22, 2024) covers change gas line size running to stove.
How many permits and filings does 1213 Havre Lafitte Dr have?
1 filing across 1 project, from March 22, 2024 to March 22, 2024.
Is there other construction near 1213 Havre Lafitte Dr?
Yes. Nearby filings include 1209 Havre Lafitte Dr (5 foot tunnel from cleanout going into home within 5 feet to repair a small part of the pipe, Sep 26, 2024); 1221 Havre Lafitte Dr (replacement of complete existing central heat and air system with or without duct work, Jul 18, 2025); 1218 Havre Lafitte Dr (replacement of complete existing central heat and air system with or without duct work, Nov 2, 2025).
How do I get alerts for new permits at 1213 Havre Lafitte Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 1209 Havre Lafitte DrSep 26, 20245 foot tunnel from cleanout going into home within 5 feet to repair a small part of the pipe · 38 m away
- 1221 Havre Lafitte DrJul 18, 2025Replacement of complete existing central heat and air system with or without duct work · 54 m away
- 1218 Havre Lafitte DrNov 2, 2025Replacement of complete existing central heat and air system with or without duct work · 63 m away
- 2912 Thousand Oaks DrMar 9, 2025Installation of new 24 kw permanent whole home generator (natural gas) connected to house meter and main panel. no meter can required (olson eric) · 75 m away
- 1205 Havre Lafitte DrApr 5, 2024Install evse · 77 m away
- 2927 Chatelaine DrAug 18, 2026Base: installing a backup battery system and additional meter socket · 91 m away
- 1209 Tamranae CtJun 10, 2026Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 102 m away
- 1201 Havre Lafitte DrMay 23, 2024Install new gas line from meter to generator · 104 m away
- 1228 Havre Lafitte DrMay 24, 2024Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 1213 Tamranae CtNov 21, 2024Water heater change out to exist res · 123 m away
- 2913 Thousand Oaks DrMar 8, 2024Replacement of an existing water heater · 131 m away
- 1204 Tamranae CtFeb 5, 2026Replacement of complete existing central heat and air system with or without duct work change out upstairs air conditioner · 138 m away