1401 E 6th Street Level 6
Austin, TX 78746 · Centro North LP
Level 6 corridor renovation registered at Centro North
A 1,710-square-foot common-area corridor on Level 6 at 1401 E. 6th Street is slated for interior renovation. The TDLR project registration was filed December 22, 2025, and lists an applicant-estimated project cost of $500,000.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 22, 2025
- since Dec 22, 2025
- Largest scope
- 1,710 sf
- Estimated cost
- $500K
- state registration
Where this project stands
Finishing up · inspection nextCentro North - Level 6 Corridor
1,710 sq ft · $500K est.
- RegisteredDec 22, 2025
- Plan review
- ConstructionFeb '26 – Jun '26
- Inspectednow
- Closed
Scheduled to finish Jun 1, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectInterior renovation of a first generation common area corridor. — centro north
TDLR project registrationRenovation/AlterationReview Complete1,710 sq ft$500K est.- Project #
- TABS2026008724
- Tenant / owner
- Centro North - Level 6 Corridor
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1401 E 6th Street Level 6
What is being built at 1401 E. 6th Street?
A common-area corridor on Level 6 at Centro North is undergoing interior renovation. The TDLR registration describes it as a first-generation corridor.
When was the Centro North Level 6 corridor project filed?
The project was registered with TDLR on December 22, 2025. Its registration number is TABS2026008724.
How large is the Centro North corridor renovation?
The TDLR registration lists the project at 1,710 square feet.
How much will the Centro North corridor renovation cost?
The applicant estimated the project cost at $500,000 in the TDLR registration. This is an estimate, not a confirmed final cost.
Is the project near Material on East 6th Street?
Material is listed about 26 meters from the Level 6 corridor project at 1401 E. 6th Street.
What is the status of the Centro North renovation registration?
The TDLR record lists the registration as “Review Complete.” It does not provide a construction start or completion date.
Also being built nearby
All of 78746- 1401 E 6th Street · Centro North LPDec 22, 2025Roller — renovation/alteration — interior finish out of first generation space
- 1401 Eas 6th St · Centro North, LPFeb 11, 2025Fish shop — renovation/alteration — interior alterations of existing restaurant to new restaurant 1517sf
- 1401 East 6th Street Austin TX 78702 · Centro North LPDec 22, 2025Rwe centro office addition — renovation/alteration — adding one interior office
- 1401 East 6th Street · Centro South, LPApr 8, 2026Atlassian east bluebonnet tenant inprovement — renovation/alteration — alterations to existing exit access stairs between floor 3 & 5 - 1665sf
- 1401 E 6th St, 1st · Centro North LPMay 9, 2024Good vets — renovation/alteration — interior alterations for a veterinary clinic, including new partitions and ceilings, new restroom select mechanical, electrical and plumbing within the landlord's shell space
- 1403 E. 6th Street · Centro West Jv LPApr 30, 2024Nike nss — renovation/alteration — tenant finish in 1st gen space for fitness center · 2 m away
- 1400 E 6th St · 1400 E 6thMay 4, 2026Conversion of an existing parking lot into an ev charging fleet site including prefab restroom building · 37 m away
- 1401 E 6th St · Centro North LPJul 22, 20267 day - interior tenant finish out of a first generation office space - ova · 45 m away
- 1308 E 6th StNov 4, 2024Install 90000 grain kdc filtration unit in liquor storage room. job to include the following: *repipe all water lines in liquor storage room in pex eliminating multiple types of piping (some materials are dissimilar & react negatively with one another) *properly insulate and secure all water piping *install 90000 grain kdc filtration unit at main water feed to building (to filter all incoming water) *install discharge for the kdc & route to floor drain *install isolation valves for the kdc for unit service (or to shut water off to the interior of the building in an emergency) *pull & reset electric water heater in same location (wooden platform in very poor condition) * re route t&p line from hub drain to the exterior of the building *install a water heater pan drain & terminate at the exterior of the building (to minimize damage from a water heater leak) · 52 m away
- 1305 E 6th StJun 11, 2025Replacement of complete existing central heat and air system with or without duct work change out like for like 1 heat pump with no duct work · 80 m away
- 1300 E 5th St · 1300 East 5th St Austin Owner LLCOct 26, 2026Pilates addiction back lit channel letters · 91 m away
- 1401 E 7th StSep 25, 2024Change of use no interior remodel proposed · 91 m away