1703 Wild Basin Ledge
Austin, TX 78746
Electrical permits for 4,000-square-foot new construction
Electrical permits at 1703 Wild Basin Ledge indicate work tied to a 4,000-square-foot new-construction project. The latest permit was filed January 2, 2026; an earlier permit for a temporary power loop was filed August 20, 2025. Both City of Austin permits are marked final.
Summarized from City of Austin records · updated Jan 2, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 2, 2026
- since Aug 20, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew construction electrical 4000 sq ft etj
- AppliedDec 15, 2025
- IssuedJan 2, 2026
- WorkJan '26 – Jan '26
- Final inspectionJan 14, 2026
Passed final inspection Jan 14, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsNew construction electrical 4000 sq ft etj
New construction electrical 4000 sq ft etj
City of Austin permitElectrical PermitFinal- Record
- 2025-158643 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Temporary power loop ***austin 2 mile etj
Temporary power loop ***austin 2 mile etj
City of Austin permitElectrical PermitFinal- Record
- 2025-104953 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1703 Wild Basin Ledge
What is being built at 1703 Wild Basin Ledge?
City of Austin electrical permits indicate work tied to new construction described as 4,000 square feet. The records do not identify a building type or occupant.
When were permits filed for 1703 Wild Basin Ledge?
The first listed permit, 2025-104953 EP, was filed August 20, 2025. The latest, 2025-158643 EP, was filed January 2, 2026.
How large is the project at 1703 Wild Basin Ledge?
The January 2, 2026 electrical permit describes new construction of 4,000 square feet.
What permits were issued for 1703 Wild Basin Ledge?
The records list two City of Austin electrical permits: 2025-104953 EP for a temporary power loop and 2025-158643 EP for new-construction electrical work. Both are marked final.
Is construction complete at 1703 Wild Basin Ledge?
Both listed electrical permits are marked final, but the records do not establish whether the overall construction project is complete.
Also being built nearby
All of 78746- 907 The High RdJul 10, 2026New service for sfr in etj · 68 m away
- 1504 Wild Basin LedgeOct 17, 2024Request to disconnect existing 200a service to install a 200a tesla gateway with 200a main breaker. no change to the meter can · 181 m away
- 1068 The High RdMay 28, 2009High canyon estates subdivision, amended plat of · 213 m away
- 804 Canyon CreekMar 19, 2024Temp meter loop for a demolition/rebuild in the etj · 282 m away
- 1901 Toro Canyon RdJun 13, 2025New construction in the etj · 316 m away
- 1201 The High RdFeb 10, 2009High oaks, amended plat of lots a & c — high oaks, amended plat of lots a & c · 387 m away
- 5101 Scenic View DrJun 20, 2025Electrical service meter installation for new construction of sfr in the etj. 4589 sq ft · 393 m away
- 803 Terrace Mountain DrJan 1, 2025Upgrade main electrical service to 200a for the installation of a generator interlock kit · 425 m away
- 2003 Paisano RdDec 18, 2023Request to disconnect - install transfer switch · 450 m away
- 1827 Logans Hollow DrJul 2, 2024Request to disconnect existing 200 amp meter can installation of a 200 a ats · 471 m away
- 2108 Paisano RdOct 28, 20244.2kw rooftop solar expansion · 472 m away
- 620 Logans LnMar 17, 202530kw kohler at end of driveway - mount one 200amp regular transfer switch on right of main breaker panel -- from transfer switch trench across small grass area 10ft to edge of driveway. trench 40ft down the edge of driveway to generator - 50 total feet **disconnect/reconnect to install 200a ats · 492 m away