1904 Canonero Dr
Austin, TX 78746
1904 Canonero Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1904 Canonero Dr, Austin, TX 78746. The most recent, filed September 10, 2025, covers: “Express: siding replacement door replacement (like for like)”.
Compiled from City of Austin records · updated Sep 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 10, 2025
- since Sep 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: siding replacement door replacement (like for like)
- AppliedAug 29, 2025
- IssuedSep 10, 2025
- WorkSep '25 – Oct '25
- Final inspectionOct 6, 2025
Passed final inspection Oct 6, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: siding replacement door replacement (like for like)
Express: siding replacement door replacement (like for like)
City of Austin permitBuilding PermitFinal- Record
- 2025-110039 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1904 Canonero Dr
What is being built at 1904 Canonero Dr?
The latest filing (City of Austin permit 2025-110039 BP, September 10, 2025) covers express: siding replacement door replacement (like for like).
How many permits and filings does 1904 Canonero Dr have?
1 filing across 1 project, from September 10, 2025 to September 10, 2025.
Is there other construction near 1904 Canonero Dr?
Yes. Nearby filings include 1908 Canonero Dr (replacement of complete existing central heat and air system with or without duct work, May 14, 2024); 5909 Northern Dancer Dr (change out two water heater to existing residence, Nov 21, 2024); 2000 Canonero Dr (dig under foundation to replace approximately 15ft of main sewer line. not going into the floor no drywall removal, Aug 7, 2026).
How do I get alerts for new permits at 1904 Canonero Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 1908 Canonero DrMay 14, 2024Replacement of complete existing central heat and air system with or without duct work · 35 m away
- 5909 Northern Dancer DrNov 21, 2024Change out two water heater to existing residence · 87 m away
- 2000 Canonero DrAug 7, 2026Dig under foundation to replace approximately 15ft of main sewer line. not going into the floor no drywall removal · 103 m away
- 1901 Canonero DrMar 11, 2025Replacement of an existing water heater · 105 m away
- 1808 Canonero DrFeb 17, 2025Replacement of complete existing central heat and air system with or without duct work 1.5-ton carrier comfort series 15.2-seer2 heat pump ac & heating system · 123 m away
- 1803 Real Wind CvOct 16, 2025Express - replace 1 existing [sliding glass] patio door - size for size · 136 m away
- 5908 Northern Dancer DrJan 9, 2024Replacement of complete existing central heat and air system with or without duct work · 140 m away
- 5905 Sir Ivor CvAug 14, 2025Replacement of complete existing central heat and air system with or without duct work · 140 m away
- 1800 Canonero DrJun 24, 2026Replacement of (3) complete existing central heat and air system with or without duct work · 163 m away
- 2008 Canonero DrMay 1, 2026Replacement of an existing water heater replace existing 50-gallon electric water heater · 194 m away
- 6007 Northern Dancer DrMar 27, 2026Install automatic transfer switch in service for generator. install generator · 201 m away
- 1737 Canonero DrDec 2, 2024Ev install · 249 m away