2000 Barton Springs Rd
Austin, TX 78746
Pathway lighting work at 2000 Barton Springs Road
Austin permits indicate pathway-lighting infrastructure and electrical work at 2000 Barton Springs Road, not a new building. A May 15, 2023 permit covered underground conduit installed with concrete pathways; later permits covered wiring and lighting pedestals on Dec. 27, 2023, and repairs to Trail of Lights wiring on Nov. 21, 2023.
Summarized from City of Austin records · updated Dec 27, 2023
- Projects
- 6
- 6 filings
- Latest filing
- Dec 27, 2023
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAt 2000 barton springs rd. unit e install new wiring and lighting pedestals for the previously install conduit system under finaled permit 2023-055956 ep. 31 plbac-102-bz-asm-nw-uv7-pa bollards. circuit 10 from existing electrical panel unit e
- AppliedDec 22, 2023
- IssuedDec 27, 2023
- WorkDec '23 – Mar '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
6 projectsAt 2000 barton springs rd. unit e install new wiring and lighting pedestals for the previously install conduit system under finaled permit 2023-055956 ep. 31 plbac-102-bz-asm-nw-uv7-pa bollards. circuit 10 from existing electrical panel unit e
At 2000 barton springs rd. unit e install new wiring and lighting pedestals for the previously install conduit system under finaled permit 2023-055956 ep. 31 plbac-102-bz-asm-nw-uv7-pa bollards. circuit 10 from existing electrical panel unit e
City of Austin permitElectrical PermitFinal- Record
- 2023-162891 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
2000 barton springs rd. near volley ball court. repair damaged underground conduit and replace damaged wiring for trail of lights in ground junction box #74
2000 barton springs rd. near volley ball court. repair damaged underground conduit and replace damaged wiring for trail of lights in ground junction box #74
City of Austin permitElectrical PermitFinal- Record
- 2023-149733 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install underground conduit without wiring for future pathway lighting. this will be installed in conjunction with concrete pathways now being installed. no electrical wiring or luminaries are included. these conduits will be under the concrete so they must be installed now. the included drawings show the proposed pathways. fixture locations and proposed conductor fill for future permitting is also indicated
Install underground conduit without wiring for future pathway lighting. this will be installed in conjunction with concrete pathways now being installed. no electrical wiring or luminaries are included. these conduits will be under the concrete so they must be installed now. the included drawings show the proposed pathways. fixture locations and proposed conductor fill for future permitting is also indicated
City of Austin permitElectrical PermitFinal- Record
- 2023-055956 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2000 Barton Springs Rd
What is being built at 2000 Barton Springs Road?
Permits indicate pathway-lighting infrastructure and related electrical work. The May 15, 2023 permit, 2023-055956 EP, covered underground conduit installed with concrete pathways.
Is a new building going up at 2000 Barton Springs Road?
The listed recent permits describe pathway lighting, electrical wiring, and conduit work, not construction of a new building.
When was the pathway lighting work permitted?
The conduit permit, 2023-055956 EP, was filed May 15, 2023. A later permit for wiring and lighting pedestals, 2023-162891 EP, was filed Dec. 27, 2023.
What does permit 2023-162891 EP cover?
Filed Dec. 27, 2023, it covers wiring and lighting pedestals at Unit E for a previously installed conduit system. The permit is marked final.
Was there work on the Trail of Lights wiring?
Yes. Permit 2023-149733 EP, filed Nov. 21, 2023, covers repairs to damaged underground conduit and wiring for the Trail of Lights.
Are the permits for a new pathway or just lighting?
The May 2023 permit describes underground conduit for future pathway lighting, installed in conjunction with concrete pathways. It does not specify the full scope or layout of the pathways.
Also being built nearby
All of 78746- 1912-1/2 Barton Springs RdSep 9, 2026Tpw - barton springs rd bridge · 79 m away
- 1900 Barton Springs RdSep 17, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 160 m away
- 1806 Barton Springs RdMar 2, 2007Barton springs properties · 192 m away
- 1804 Barton Springs RdMar 2, 2007Permit activity · 202 m away
- 428 Sterzing StMar 2, 2007428 sterzing · 208 m away
- 511 Barton BlvdJun 4, 2025Repair existing tree light · 218 m away
- 408 Sterzing StDec 21, 2011Zilker park lofts · 219 m away
- 523 Barton BlvdApr 17, 2026Meter rack. for new build home and main home. service being moved from main house. ref 2025-078377 ep · 233 m away
- 406 Sterzing StJul 23, 2026Replacement of complete existing central heat and air system with or without duct work · 235 m away
- 525 Barton BlvdJun 24, 2026Replace yard water line and yard gas line · 253 m away
- 1801 Sunset VwMay 28, 2025Emergency relocate the gas curb meter next to the right front corner of the house. away from windows and crawl space vents · 273 m away
- 501 Cliff DrJul 14, 2026Cap off water & wastewater total demolition of duplex 2200 sq ft circa 1966 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 287 m away