2000 Cueva De Oro Cv
Austin, TX 78746
2000 Cueva De Oro Cv: 3 projects on record
City of Austin lists 3 filings across 3 projects at 2000 Cueva De Oro Cv, Austin, TX 78746 since May 2, 2024. The most recent, filed April 16, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Apr 16, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Apr 16, 2025
- since May 2, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedOct 1, 2024
- IssuedApr 16, 2025
- !WorkApr '25 – Feb '26
- Final inspection
Marked expired Feb 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-132958 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-050474 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install gas line to generator
Install gas line to generator
City of Austin permitPlumbing PermitExpired- Record
- 2023-051755 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2000 Cueva De Oro Cv
What is being built at 2000 Cueva De Oro Cv?
The latest filing (City of Austin permit 2024-132958 MP, April 16, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 2000 Cueva De Oro Cv have?
3 filings across 3 projects, from May 2, 2024 to April 16, 2025.
Is there other construction near 2000 Cueva De Oro Cv?
Yes. Nearby filings include 2012 Cueva De Oro Cv (replacement of complete existing central heat and air system with or without duct work, Jun 5, 2024); 2020 Cueva De Oro Cv (new in-ground pool and spa, Aug 21, 2025); 2009 Cueva De Oro Cv (replacement of complete existing central heat and air system with or without duct work replacement of hvac system, Nov 10, 2026).
How do I get alerts for new permits at 2000 Cueva De Oro Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 2012 Cueva De Oro CvJun 5, 2024Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 2020 Cueva De Oro CvAug 21, 2025New in-ground pool and spa · 91 m away
- 2009 Cueva De Oro CvNov 10, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 95 m away
- 2001 Cueva De Oro CvApr 30, 2026Install 1.25 gas pipe mounted to side of home approximately 15 to generator · 97 m away
- 1905 Cueva De Oro CvOct 10, 2016The preserve at lost gold cave-phase 1 lots 7 & 8, block a;amended plat of · 178 m away
- 3517 Peregrine Falcon DrAug 23, 2024Replacement of complete existing central heat and air system with or without duct work · 193 m away
- 3627 Stoneridge RdMar 18, 2009Stoneridge place subdivision — stoneridge place subdivision · 226 m away
- 3513 Peregrine Falcon DrNov 10, 2026Total demolition of sfr 1760 sq ft circa 1979 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 240 m away
- 3634 Stoneridge RdApr 8, 2025Etj bring existing 200 amp panel and meter up to current code. replace meter can riser and grounding system · 245 m away
- 3617 Peregrine Falcon DrJan 31, 2024New gas line from meter for generator · 250 m away
- 3417 Rain Forest DrJan 30, 2024Replacement of an existing water heater · 260 m away
- 3605 Stoneridge RdNov 18, 2026Installation of (3) 200a service-rated automatic transfer switches/load centers 60kw whole home generator additional grounding and type 2 surge protection · 264 m away