202 Ridgewood Rd
Austin, TX 78746
202 Ridgewood Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 202 Ridgewood Rd, Austin, TX 78746. The most recent, filed September 25, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton 2 stage vertical gas system”.
Compiled from City of Austin records · updated Sep 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 25, 2025
- since Sep 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 5 ton 2 stage vertical gas system
- AppliedSep 22, 2025
- IssuedSep 25, 2025
- WorkSep '25 – Feb '26
- Final inspectionFeb 11, 2026
Passed final inspection Feb 11, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work like for like: 5 ton 2 stage vertical gas system
Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton 2 stage vertical gas system
City of Austin permitMechanical PermitFinal- Record
- 2025-120593 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 202 Ridgewood Rd
What is being built at 202 Ridgewood Rd?
The latest filing (City of Austin permit 2025-120593 MP, September 25, 2025) covers replacement of complete existing central heat and air system with or without duct work like for like: 5 ton 2 stage vertical gas system.
How many permits and filings does 202 Ridgewood Rd have?
1 filing across 1 project, from September 25, 2025 to September 25, 2025.
Is there other construction near 202 Ridgewood Rd?
Yes. Nearby filings include 203 Ridgewood Rd (project includes proposed replacement and repair of structural elements of an existing legal noncomplying deck which are needed for health and safety requirements. the existing legal noncomplying deck located within the front yard and street-side yard setback will remain and is being extended as allowed under ldc 25-2-963(f)(2). a portion of the existing legal noncomplying deck will be demolished. additionally another deck that is fully compliant will be demolished and rebuilt. project is wuic zoning and will require class a fire proofing, Jul 24, 2026); 22-1/2 Sugar Shack Dr (travis co. wcid no. 10 ridgewood village phase 1 water line improvements, May 17, 2013); 3007 Stratford Dr (replacement of complete existing central heat and air system with or without duct work, Jun 10, 2024).
How do I get alerts for new permits at 202 Ridgewood Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 203 Ridgewood RdJul 24, 2026Project includes proposed replacement and repair of structural elements of an existing legal noncomplying deck which are needed for health and safety requirements. the existing legal noncomplying deck located within the front yard and street-side yard setback will remain and is being extended as allowed under ldc 25-2-963(f)(2). a portion of the existing legal noncomplying deck will be demolished. additionally another deck that is fully compliant will be demolished and rebuilt. project is wuic zoning and will require class a fire proofing · 47 m away
- 22-1/2 Sugar Shack DrMay 17, 2013Travis co. wcid no. 10 ridgewood village phase 1 water line improvements · 86 m away
- 3007 Stratford DrJun 10, 2024Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 303 Ridgewood RdJan 22, 2024Cap off water and waste water for demolition. total demolition of sfr 1888 sq ft circa 1953 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 99 m away
- 2911 Stratford DrMay 30, 2026Install 2 ton mini split system (garage) · 108 m away
- 104 W Canyon CirJul 25, 2024Installed new main water line from main house to accessory building · 109 m away
- 2909 Stratford DrMay 23, 2026Eplan: residential expedited review - interior remodel only to existing 2-story single family res. [5bed 4 bath] work to include: replacing windows and doors · 156 m away
- 309 Ridgewood RdJan 9, 2025Replacement of an existing water heater · 160 m away
- 310 Ridgewood RdNov 12, 2026Total demolition of sfr 1801 sq ft circa 1974 · 165 m away
- 3117 Above Stratford PlFeb 23, 2024Addition of a new 3-level steel deck to rear of existing 3-story sfr · 178 m away
- 3111 Above Stratford PlJan 31, 2024This const loop is for construction purpose ref: 2022-028622 bp · 182 m away
- 311 Ridgewood RdJul 29, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton two-stage gas system · 189 m away