2307 Cypress Point East
Austin, TX 78746
Electrical permits address existing T-pole wiring in Austin ETJ
City of Austin permits show electrical work on an existing T-pole at 2307 Cypress Point East. The first permit was filed July 26, 2025, and a follow-up permit filed July 17, 2026, describes correcting wiring that had been connected improperly. Both permits are marked final.
Summarized from City of Austin records · updated Jul 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 17, 2026
- since Jul 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledI have to rewire the existing t pole because line side was connect on load side so previous permit# 2025 092020 305 was approved with incorrect wiring
- AppliedJul 8, 2026
- IssuedJul 17, 2026
- WorkJul '26 – Jul '26
- Final inspectionJul 28, 2026
Passed final inspection Jul 28, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsI have to rewire the existing t pole because line side was connect on load side so previous permit# 2025 092020 305 was approved with incorrect wiring
I have to rewire the existing t pole because line side was connect on load side so previous permit# 2025 092020 305 was approved with incorrect wiring
City of Austin permitElectrical PermitFinal- Record
- 2026-087972 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
T-pole ***austin etj*** no bp
T-pole ***austin etj*** no bp
City of Austin permitElectrical PermitFinal- Record
- 2025-092020 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2307 Cypress Point East
What is happening at 2307 Cypress Point East?
City of Austin records show electrical work on an existing T-pole. The July 2026 permit describes rewiring it to correct an earlier wiring connection.
Is a new building being built at 2307 Cypress Point East?
The records provided show two electrical permits for an existing T-pole, not a permit for a new building.
When was the electrical work permitted?
The first permit, 2025-092020 EP, was filed July 26, 2025. A follow-up permit, 2026-087972 EP, was filed July 17, 2026.
What does permit 2026-087972 EP cover?
The permit description says the existing T-pole needed rewiring because the line side had been connected on the load side. The permit is marked final.
Are the permits for 2307 Cypress Point East final?
Yes. Both City of Austin electrical permits, 2025-092020 EP and 2026-087972 EP, are listed as final.
Also being built nearby
All of 78746- 2303 Cypress Point EastJul 15, 2025*emergency repair* replace existing 125 amp main breaker with new. need austin energy disconnect to safely replace · 65 m away
- 2300 Cypress Point EastApr 8, 2024Addition add covered porch to rear of house and extend patio 387 sq ft-work/ subtype modified as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163 · 89 m away
- 2317 Cypress Point EastSep 29, 2025New addition with bathroom sewer tie in to existing and water /to include clothes washer/sink/shower/comode · 118 m away
- 6200 Olympic OverlookMay 20, 2024Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 2209 Cypress Point EastSep 13, 2024Remodel (interior only) kitchen mbr and bath. lr new windows new flooring new lighting roofline and exterior walls to remain unchanged · 129 m away
- 6203 Turtle Point DrJun 4, 2025Outside electrical panel · 136 m away
- 2319 Cypress Point EastSep 12, 2024Expedited review - new construction of a 2-story single family res. [5bed 7bath] with basement and attached garage.-permit voided as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163 · 142 m away
- 6203 Olympic OverlookAug 13, 2024Replacement of complete existing central heat and air system with or without duct work-permit voided as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163 · 142 m away
- 6109 Turtle Point DrJul 30, 2024Expedited review - *partial demolition* addition to existing 1-story sfr to include a 2nd-story addition two additional bedrooms and 1 additional bathroom [6bed 4bath].-permit voided as a result of disannexation effective september 9 2024. see ordinance no. 20240829-163 · 151 m away
- 6205 Olympic OverlookDec 8, 2023Panel upgrade · 159 m away
- 6107 Turtle Point DrFeb 20, 2026Upgrade to a 200amp service · 162 m away
- 6204 Olympic OverlookApr 13, 2026Install gas line for new meter to be installed by city · 181 m away