2507 Westlake Dr
Austin, TX 78746
Shoreline access and pier repairs at 2507 Westlake Dr
A permit filed June 4, 2026, covers maintenance and replacement work on existing shoreline access at 2507 Westlake Dr. The work includes replacing a metal roof, resurfacing a second-floor deck, replacing stair treads and repairing or replacing a hydraulic lift; the permit says there will be no footprint expansion or structural modifications. A separate permit filed August 18, 2025, covered repairs to a pier damaged by a boat.
Summarized from City of Austin records · updated Jun 4, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jun 4, 2026
- since Apr 12, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledMinor construction limited to maintenance/replacement of an existing shoreline access approx.240 sq ft of ground-level boardwalks. there will be no increase in the existing footprint of the dock bulkhead or shoreline access. **replacement of metal roof resurface 2nd floor deck and replace treads on existing stairs. the area of the roof and deck will remain unchanged. some plywood decking will need replacement. no structural modifications. no expansion of footprint. no disturbing of shoreline or lakebed. add replacement or repair of hydraulic lift
- AppliedJun 2, 2026
- IssuedJun 4, 2026
- WorkJun '26 – Oct '26
- Final inspectionOct 16, 2026
Passed final inspection Oct 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsMinor construction limited to maintenance/replacement of an existing shoreline access approx.240 sq ft of ground-level boardwalks. there will be no increase in the existing footprint of the dock bulkhead or shoreline access. **replacement of metal roof resurface 2nd floor deck and replace treads on existing stairs. the area of the roof and deck will remain unchanged. some plywood decking will need replacement. no structural modifications. no expansion of footprint. no disturbing of shoreline or lakebed. add replacement or repair of hydraulic lift
Minor construction limited to maintenance/replacement of an existing shoreline access approx.240 sq ft of ground-level boardwalks. there will be no increase in the existing footprint of the dock bulkhead or shoreline access. **replacement of metal roof resurface 2nd floor deck and replace treads on existing stairs. the area of the roof and deck will remain unchanged. some plywood decking will need replacement. no structural modifications. no expansion of footprint. no disturbing of shoreline or lakebed. add replacement or repair of hydraulic lift
City of Austin permitBuilding PermitFinal- Record
- 2026-069672 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Repair pier damaged when struck by a boat ref: 2024-143367 da
Repair pier damaged when struck by a boat ref: 2024-143367 da
City of Austin permitBuilding PermitFinal- Record
- 2025-102346 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2507 Westlake Dr
What is being built at 2507 Westlake Dr?
The June 4, 2026, permit describes maintenance and replacement of existing shoreline access, including work on a roof, deck, stairs and hydraulic lift. It does not describe a new building or an expansion.
Is there a new dock being built at 2507 Westlake Dr?
The permit describes work on existing shoreline access and says there will be no expansion of the existing footprint. It also says there will be no disturbance of the shoreline or lakebed.
What work does permit 2026-069672 BP cover?
The June 4, 2026, permit covers replacement of a metal roof, resurfacing a second-floor deck, replacing stair treads and replacing some plywood decking. It also includes repair or replacement of a hydraulic lift, with no structural modifications.
Was the pier at 2507 Westlake Dr damaged?
A City of Austin permit filed August 18, 2025, says the pier was damaged when struck by a boat. Permit 2025-102346 BP covers its repair.
Will the shoreline access at 2507 Westlake Dr get larger?
No expansion is described in the June 4, 2026, permit. It says the roof and deck areas will remain unchanged and the existing dock, bulkhead and shoreline access footprints will not increase.
Also being built nearby
All of 78746- 2503 Westlake DrDec 1, 2025West harbour residences · 77 m away
- 2504 Westlake DrJan 26, 2024Expedited review - new 2-story accessory structure [1.5bath] with mezzanine · 109 m away
- 2603 Westlake Drive · West Rim Owners AssociationApr 9, 2025West rim cluster dock — renovation/alteration — demolition and rebuild of an existing 24 slip cluster dock including enclosed (unconditioned) storage closets. total area under roof · 121 m away
- 2461 Westlake DrDec 13, 2023Interior remodel bed and bath addition of 2nd floor balcony · 126 m away
- 2514 Westlake DrMar 2, 2007Lakeshore addition, resubdivision of a portion of lots 39 & 40 — lakeshore addition, resubdivision of a portion of lots 39 & 40 · 129 m away
- 2443 Westlake DrFeb 26, 2026Eplan: residential expedited review: addition and remodel of existing townhome. addition of third floor. remodel of the exterior facades windows and reconfiguration of the floorplan · 148 m away
- 2603 Westlake DrMay 15, 2026West rim owners association cluster dock · 158 m away
- 2441 Westlake DrDec 3, 2025Addition and remodel interior remodel of entry kitchen and 2nd floor adding conditioned sq ft to entry updating the exterior facades and replacing all 2nd floor windows repairing the roof and adding a roof deck on the top of the building 13401836 · 159 m away
- 2419 Westlake DrOct 2, 2026Addition and remodel remodel kitchen master bed/bath add 2nd floor over existing garage add loft over new 2nd floor · 164 m away
- 2605 Westlake DrOct 28, 2010Conway silt abatement · 179 m away
- 2431 Westlake DrOct 10, 2025Express - window and door replacement throughout property · 183 m away
- 3905 Bennedict LnApr 15, 2026Ran gas line for generator · 184 m away